Telecom Sub Compliance

Subs Stay Compliant.
Without the Paperwork Chase.

The Challenge

01

Subcontractor paperwork is always missing

Insurance certs, training records, equipment inspections. Getting subs to submit documentation is a constant battle.

02

Compliance status is unknown until audit day

You do not know which subs are fully compliant and which have gaps until someone manually checks every file.

03

Different carriers require different documentation

Each carrier has different sub-compliance requirements. Tracking who needs what is a spreadsheet nightmare.

04

Training records expire without notice

A climber certification expires and nobody knows until the inspector checks. Work stops, schedules slip.

The POD Advantage

Upload Links for Sub Documentation

Zero friction

Send subs a link. They upload certs, training records, and insurance from their phone. No accounts needed.

Real-Time Compliance Dashboard

Instant visibility

See every sub compliance status at a glance. Green, yellow, red. Know who needs attention right now.

Carrier-Mapped Requirements

Always correct

Compliance checklists mapped to each carrier requirement. The right requirements load for each project.

Expiration Alerts

Proactive alerts

Automatic alerts 30, 14, and 7 days before any certification or insurance expires. Never get caught off guard.

Key Features

“We stopped chasing subs for paperwork. Upload links and expiration alerts handle it automatically.”

— Compliance Manager, Telecom General Contractor

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Ready to Transform Your Reporting?

Join thousands of construction professionals using POD.

Last updated: February 2026