Transportation & Infrastructure Template

EV Charging Infrastructure Daily Report Template

170+ fields across 11+ sections. NEC 625, ADA, NEVI Program compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

EV Charging Infrastructure

Construction Daily Report — 5 industry sections + 8 common sections

0
Total Fields
56
Industry Fields
98
Common Fields
35
KPI Mapped
NEC 625ADANEVI ProgramFHWAState PUC
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

EV Charging Infrastructure — Industry Sections (56 fields)

Field NameTypeUnitRequiredPOD KPI
Parking Stalls ConstructedIntegerstallsRequiredCostPerInstallUnit
ADA-Compliant StallsIntegerstallsRequired (ADA/NEVI)
Concrete Pad / Island PouredNumberCYRequired
Bollard InstallationIntegercountRequired
Canopy FoundationIntegercountBest Practice
Canopy Structure ErectedIntegercountBest Practice
Pavement StripingNumberLFRequired
Signage InstalledIntegersignsRequired (MUTCD/NEVI)
Curb / Wheel StopIntegercountRequired
Stormwater / DrainageEnumN/A / In Progress / CompleteRequired
Landscaping / BufferNumberSFBest Practice
Field NameTypeUnitRequiredPOD KPI
Utility Service ConnectionEnumN/S / Application / Approved / ConnectedRequired
Utility Service SizeNumberkW / ARequired
Utility Transformer - Pad InstalledBooleanY/NRequired
Utility Transformer - EnergizedBooleanY/NRequired
Main Switchgear / SwitchboardEnumN/S / Installed / TestedRequired
Switchgear RatingNumberARequired
Conduit InstalledNumberLFRequiredCostPerInstallUnit
Conduit Size / TypeTextinches / EMT/RGS/PVCRequired
Conductor PulledNumberLFRequired
Conductor SizeTextAWG / kcmilRequired
Panelboard InstalledIntegercountRequired
Grounding Electrode SystemEnumN/S / In Progress / CompleteRequired (NEC 250)
Ground Rod InstalledIntegerrodsRequired
Ground Resistance TestedNumberohmsRequired (NEC)InspectionFirstPassRate
Surge Protection InstalledBooleanY/NRequired
Field NameTypeUnitRequiredPOD KPI
DCFC Chargers InstalledIntegerunitsRequiredCostPerInstallUnit
DCFC Charger RatingNumberkWRequired
DCFC Connector TypeEnumCCS/CHAdeMO/NACS(Tesla)Required (NEVI: CCS + NACS)
Level 2 Chargers InstalledIntegerunitsRequired
Level 2 RatingNumberkWRequired
Charger Manufacturer / ModelTextRequired
Charger Pedestal / MountEnumPedestal/Wall/CeilingRequired
Charger Power ConnectionEnumN/S / Connected / TestedRequired
Charger Network ConnectionEnumN/S / Connected / OnlineRequired
Payment Terminal IntegrationEnumN/A / Installed / TestedRequired (NEVI)
Cable Management SystemEnumN/A / InstalledBest Practice
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026