Transportation & Infrastructure Template

Intersection / Interchange Daily Report Template

190+ fields across 11+ sections. MUTCD, AASHTO, State DOT compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Intersection / Interchange

Construction Daily Report — 4 industry sections + 8 common sections

0
Total Fields
34
Industry Fields
98
Common Fields
35
KPI Mapped
MUTCDAASHTOState DOTADA
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Intersection / Interchange — Industry Sections (34 fields)

Field NameTypeUnitRequiredPOD KPI
Demolition / RemovalNumberSYRequired
Earthwork / Subgrade PrepNumberCYRequiredCostPerInstallUnit
Aggregate BaseNumbertonsRequired
Curb & GutterNumberLFRequiredCostPerInstallUnit
ADA Curb Ramp — BuiltIntegerrampsRequired (ADA/PROWAG)CostPerInstallUnit
ADA Ramp — Slope VerificationEnumN/T / Pass / FailRequired (ADA)InspectionFirstPassRate
Detectable Warning SurfaceIntegerrampsRequired (ADA)
Median / Channelization IslandNumberSFRequired
Asphalt PavingNumbertonsRequiredCostPerInstallUnit
Concrete Pavement (intersection apron)NumberCYRequired
Roundabout — Central IslandEnumN/A / In Progress / CompleteRequired (if roundabout)
Roundabout — Truck ApronEnumN/A / In Progress / CompleteRequired (if roundabout)
Field NameTypeUnitRequiredPOD KPI
Storm Drain PipeNumberLFRequiredCostPerInstallUnit
Inlet / Catch BasinIntegerunitsRequired
Utility Relocation (water/sewer/gas)NumberLFRequired
Conduit — Signal/LightingNumberLFRequiredCostPerInstallUnit
Junction / Pull BoxIntegerunitsRequired
Field NameTypeUnitRequiredPOD KPI
Signal Pole / Mast Arm FoundationIntegerfoundationsRequiredCostPerInstallUnit
Signal Pole — ErectedIntegerpolesRequiredCostPerInstallUnit
Signal Head — InstalledIntegerheadsRequired (MUTCD)
Pedestrian Signal HeadIntegerheadsRequired (MUTCD)
Signal Cable — PulledNumberLFRequired
Loop Detector / Video DetectionIntegerunitsRequired
Controller Cabinet — SetIntegercabinetsRequired (NEMA TS-2)
Controller — Programmed & TimedIntegercontrollersRequiredInspectionFirstPassRate
Signal — Turn-On TestEnumN/T / Pass / FailRequiredInspectionFirstPassRate
Luminaire / Street LightIntegerpolesRequired
Interconnect Communication (fiber/twisted pair)NumberLFRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026