Transportation & Infrastructure Template

Pipeline Construction Daily Report Template

260+ fields across 15+ sections. DOT PHMSA 49 CFR 192/195, API 1104, ASME B31.4/B31.8 compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Pipeline Construction

Construction Daily Report — 8 industry sections + 8 common sections

0
Total Fields
94
Industry Fields
98
Common Fields
48
KPI Mapped
DOT PHMSA 49 CFR 192/195API 1104ASME B31.4/B31.8OSHAEPA
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Pipeline Construction — Industry Sections (94 fields)

Field NameTypeUnitRequiredPOD KPI
ROW WidthNumberftRequired
Clearing - LF CompletedNumberLFRequiredCostPerInstallUnit
Clearing - Acres TodayNumberacresRequired
Grubbing CompletedNumberLFRequired
Topsoil StrippingNumberCYRequired (environmental)
Topsoil Stockpile LocationTextMP referenceRequired
Timber Mat PlacementNumbermatsRequired (wetland areas)
Erosion Control - Silt FenceNumberLFRequired (SWPPP)
Erosion Control - Straw WattleNumberLFRequired (SWPPP)
Wetland / Waterbody CrossingBooleanY/NRequired (USACE 404)
Environmental Monitor On-SiteBooleanY/NRequired (FERC)
Field NameTypeUnitRequiredPOD KPI
Pipe Joints StrungIntegerjointsRequiredCostPerInstallUnit
Pipe LF StrungNumberLFRequired
Pipe DiameterNumberinchesRequired
Pipe Wall ThicknessNumberinchesRequired
Pipe GradeTextAPI 5L gradeRequired
Pipe Coating TypeEnumFBE/3LPE/BareRequired
Field Bends - CountIntegerbendsRequired
Bend DegreeNumberdegreesRequired
Bend MethodEnumMachine/ShopRequired
Bend Inspection - Pass/FailEnumPass/FailRequiredInspectionFirstPassRate
Pipe Damage / RejectsIntegerjointsRequiredReworkVelocity
Field NameTypeUnitRequiredPOD KPI
Welds CompletedIntegerweldsRequiredCostPerInstallUnit
Weld # (sequential)TextRequired (API 1104)
Weld TypeEnumMainline/Tie-In/Fabrication/RepairRequired
Weld ProcessEnumSMAW/GMAW/FCAW/AutomaticRequired (API 1104)
Welder ID / Stall #TextRequired (API 1104)
Weld Procedure (WPS)TextWPS #Required (API 1104)
Visual Inspection - ResultEnumAccept/RejectRequired (API 1104)InspectionFirstPassRate
Radiography (X-ray) ShotsIntegerexposuresRequired (49 CFR)
Radiography - AcceptIntegerweldsRequired
Radiography - RejectIntegerweldsRequired
Radiography - RepairIntegerweldsRequiredReworkVelocity
UT (Ultrasonic) - TestedIntegerweldsRequired (if AUT)
UT - Accept/RejectEnumAccept/RejectRequired
Weld Reject Rate (daily)Number%RequiredReworkVelocity
Weld Maps UpdatedBooleanY/NRequired
Preheat TemperatureNumber°FRequired (API 1104)
Interpass TemperatureNumber°FRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026