Accountability

Your Subcontractors Are Submitting Incomplete Daily Reports.
POD Templates Fix This.

Subcontractor daily reports average 6 fields. You need 85+. The gaps hide schedule delays, safety risks, and back-charge disputes.

0
Fields in Avg Sub Daily Report
0+
Fields You Actually Need
0%
Subs Submit Reports Late or Never
0
K Lost Per Project to Sub Disputes
“We had a sub claim they were fully manned for 6 weeks. When we pulled their daily reports, 22 of 30 days showed no report at all. The 8 reports they did submit showed half the required crew. POD would have flagged this on day one.”

— Superintendent, Commercial GC

The Challenge

Before POD

×

Subcontractors submit daily reports that say virtually nothing

The typical sub daily report: date, weather, crew count, "continued work on Level 3." No production quantities, no material usage, no equipment hours. You have no idea if they\'re on schedule, over budget, or creating safety risks — because their report tells you nothing.

×

41% of subcontractors submit reports late or not at all

Your subcontract requires daily reports, but enforcement is inconsistent. When subs don\'t report and something goes wrong — a delay, an incident, a quality failure — you have no contemporaneous record from the party responsible.

×

Back-charge disputes devolve into "he said, she said" without sub documentation

You back-charge a sub for damage to adjacent work, but their daily report for that date doesn\'t exist. They claim the damage was pre-existing. Without their daily record documenting site conditions, the back-charge is unenforceable.

×

Sub crew counts and hours don\'t match payroll or schedule loading

The sub\'s daily report says 15 workers on site, but the schedule assumed 25. Are they undermanning? You don\'t know because their report doesn\'t include trade breakdowns, hours worked, or task assignments — just a total headcount.

With POD Templates

Standardized sub report templates with 85+ required fields

Give every subcontractor a POD template with the exact fields you need: crew count by trade, production quantities by activity, material deliveries, equipment on site, and safety observations. No more accepting 6-field reports that tell you nothing.

85+ fields per sub report

Automated submission tracking with escalation alerts

POD tracks which subs have submitted daily reports and which haven\'t. Automated reminders go out at 4 PM, escalation alerts at 6 PM, and non-compliance flags appear on your dashboard by 7 PM. No more chasing subs for reports.

Zero missed reports

Back-charge documentation built into daily workflow

When you identify damage or deficient work, POD creates a back-charge record linked to the daily report with timestamped photos, affected area, responsible sub, and estimated repair cost. The documentation is created at the moment of discovery.

Enforceable back-charges

Crew and production verification against schedule loading

POD compares sub-reported crew counts against the schedule\'s resource loading. If the schedule needs 25 electricians and the sub reports 12, POD flags the undermanning immediately — not at the next OAC meeting.

Real-time crew verification

Template Highlights

Sub Compliance Dashboard

Real-time view of which subs have submitted daily reports, which are late, and which are consistently non-compliant

Voice Reporting for Subs

Subcontractor foremen speak their daily update in 3 minutes — POD extracts all 85+ fields without requiring subs to learn new software

Crew vs. Schedule Comparator

Automatic comparison of reported crew counts against schedule resource loading with undermanning alerts

Live Demo

Every KPI From a 5-Minute Voice Report

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Schedule vs Budget

Schedule & Budget Performance

SPI 0.00CPI 0.00
25%50%75%100%$0$755K$1.5M$2.3M$3.0MJanFebMarAprMayJun
Planned Progress
Actual Progress
Planned Spend
Actual Spend
SPI0.00
CPI0.00
Sched Var+0.0%
Cost Var+0.0%
Schedule 3.0% behind planbudget 1.8% under target
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Stop Accepting 6-Field Reports from Your Subs