Environmental & Specialty Template

Water / Wastewater Treatment Daily Report Template

235+ fields across 14+ sections. EPA SDWA, EPA CWA, AWWA Standards compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Water / Wastewater Treatment

Construction Daily Report — 6 industry sections + 8 common sections

0
Total Fields
83
Industry Fields
98
Common Fields
44
KPI Mapped
EPA SDWAEPA CWAAWWA StandardsTen States Standards
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Water / Wastewater Treatment — Industry Sections (83 fields)

Field NameTypeUnitRequiredPOD KPI
Excavation VolumeNumberCYRequiredCostPerInstallUnit
Excavation DepthNumberftRequired
Shoring / Trench BoxEnumN/A / In Place / MonitoredRequired (OSHA Subpart P)
DewateringEnumN/A / Active / CompleteRequired
Dewatering RateNumberGPMRequired (if active)
Rock ExcavationNumberCYRequired (if encountered)
Backfill VolumeNumberCYRequired
Backfill — Compaction TestNumber% ProctorRequiredInspectionFirstPassRate
Subgrade PreparationNumberSFRequired
Geomembrane LinerNumberSFRequired (lagoons/basins)
Field NameTypeUnitRequiredPOD KPI
Concrete PlacedNumberCYRequiredCostPerInstallUnit
Concrete Mix #TextRequired (low permeability)
Structure TypeEnumBasin/Clarifier/Channel/Vault/Wet WellRequired
Wall Pour — HeightNumberftRequired
Wall Pour — LengthNumberLFRequired
Slab / Floor PourNumberSFRequired
Slump TestNumberinchesRequiredInspectionFirstPassRate
Air ContentNumber%Required
Concrete TemperatureNumber°FRequired
Cylinders CastIntegercountRequired
Rebar PlacedNumbertonsRequired
Waterstop InstalledNumberLFRequired (ACI 350)
Waterstop TypeEnumPVC/Bentonite/MetalRequired
Formwork InstalledNumberSFRequired
Form Tie / Cone WaterproofingIntegercountRequired (ACI 350)
Leak Test — Basin/TankEnumN/T / In Progress / Pass / FailRequired (ACI 350 / AWWA)InspectionFirstPassRate
Leak Test — Drop RateNumberinches/24hrRequired
Joint Sealant (construction joints)NumberLFRequired
Field NameTypeUnitRequiredPOD KPI
Pipe Installed — Ductile IronNumberLFRequiredCostPerInstallUnit
Pipe Installed — PVC/HDPENumberLFRequired
Pipe Installed — Stainless SteelNumberLFRequired (chemical feed)
Pipe Installed — FRPNumberLFRequired (corrosive service)
Pipe DiameterTextinchesRequired
Pipe — Pressure ClassTextRequired
Valve InstalledIntegercountRequired
Valve TypeEnumGate/Butterfly/Plug/Check/BallRequired
Valve SizeTextinchesRequired
Pipe Fitting / SpecialtyIntegercountRequired
Hydrostatic Pressure TestEnumN/T / In Progress / Pass / FailRequired (AWWA C600/C605)InspectionFirstPassRate
Test PressureNumberPSIRequired
Leakage — Allowable/ActualTextgal/hrRequired
Thrust Restraint / BlockingIntegercountRequired
Pipe Bedding / BackfillNumberLFRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026