POD

Permits. Tests. Proofs.
All Digital.

0%
AWWA Compliant
0
Labs Integrated
0
Sec to Log Test

The Challenge

01

AWWA and state health department standards require extensive testing documentation

Water infrastructure must meet AWWA standards and state health department requirements. Pressure testing, bacteriological sampling, and material certifications generate mountains of documentation that must be complete and organized.

02

Certificate of completion delayed by missing test records

The water authority will not issue the certificate of completion until all pressure tests, chlorination records, and bacteriological sampling results are submitted. One missing test record holds up the entire project closeout.

03

Cross-connection control documentation gaps

Backflow preventer installations, testing, and certification must be documented for every service connection. Missing or incomplete cross-connection records can delay service activation for entire neighborhoods.

04

Multiple testing labs with inconsistent result formats

Concrete cylinders go to Lab A, soil compaction to Lab B, bacteriological samples to Lab C. Each returns results in different formats. Assembling a complete testing record requires reconciling three different systems.

The POD Advantage

AWWA Compliance Dashboard

AWWA coverage

Every AWWA standard requirement mapped to your project activities. Track pressure testing, chlorination, bacteriological sampling, and material certification completion in one real-time view.

Voice-Based Test Logging

Point-of-work logging

Document pressure tests, chlorination procedures, and sampling events by voice at the point of work. Results linked to the specific pipe segment, station, and specification section.

Closeout Readiness Tracker

Proactive closeout

See exactly which test records, certifications, and documentation items are complete and which are outstanding. Identify gaps early and address them before they delay closeout.

Multi-Lab Result Integration

Unified test records

Testing lab results from any lab, in any format, automatically linked to the correct project location and specification requirement. One complete testing record regardless of how many labs are involved.

Key Features

Live Demo

Industry-Specific KPIs That Update Themselves

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Safety Dashboard

Safety Performance

0Strong
0Days Safe
Goal: 200 days0%
Day 0 / 3650%
0 reset since start
Hours Worked0K
Recordables0
Near Misses
0reported
First Aid0
TRIR
Good
0.00per 200K hrs
Best-in-classAvg: 3.1
DART
Good
0.00per 200K hrs
Best-in-classAvg: 1.5
PODDual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Last updated: February 2026