The Challenge
Linear footage tracked inconsistently across crews
Crew A measures from manhole to manhole. Crew B measures from joint to joint. Crew C estimates based on pipe count. Your project progress number depends on which crew is reporting and how they measure.
Percent complete does not reflect actual construction sequence
The project is 60 percent complete by footage. But all the easy work is done. The remaining 40 percent includes a river crossing, a railroad bore, and three major road crossings that will take 60 percent of the remaining schedule.
Material delivery issues not correlated with production impacts
Your 24-inch pipe delivery was delayed by two weeks. The production impact is buried in narrative reports. When the delay claim is assembled months later, correlating the delivery delay to the production loss requires detective work.
Owner requested progress meetings based on outdated data
The monthly progress meeting uses data that is three weeks old. The owner sees a rosy picture while the field team knows they are behind. The disconnect erodes trust and delays decision-making.
The POD Advantage
Standardized Progress Reporting
Every crew reports progress using the same methodology through POD voice reports. Station-to-station, joint-by-joint, with consistent measurement standards across all crews.
Weighted Progress Dashboard
Progress weighted by difficulty, not just footage. Easy trenching and complex crossings reflected accurately in the completion percentage. The number tells the truth about where you stand.
Material-to-Production Correlation
Track material deliveries against installation rates daily. When a delivery delay impacts production, the correlation is documented in real time for immediate escalation and future claims.
Real-Time Owner Reporting
Give the owner access to a real-time progress dashboard. No more outdated presentations. No more trust gaps. The owner sees the same data your field team sees.
Key Features
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to See POD in Action?
Watch a 270-day project unfold in 30 seconds.