Every Sub.
Every Trench.
The Challenge
Subcontractors for excavation, pipe, paving, and restoration each report differently
Your excavation sub uses paper. Your pipe laying sub uses an app. Your paving sub sends emails. Your restoration sub does not report at all. Unifying these into a project record is a daily struggle.
Subcontractor pay quantities disputed without daily verification
The pipe sub bills for 500 feet of 16-inch main installed. Your daily logs show 465 feet. The 35-foot difference is disputed for three weeks until someone walks the line and measures.
Sub coordination for consecutive operations fails regularly
Excavation must complete before pipe installation. Pipe must be inspected before backfill. Backfill must pass compaction before paving. When one sub falls behind, three others are impacted. The coordination failures show up as delays.
Subcontractor safety violations discovered during city inspections
The city inspector finds your excavation sub operating without a trench box. You did not know because the sub does not report daily and your superintendent was at another site.
The POD Advantage
Unified Sub Reporting
Every subcontractor reports through POD by voice. One format, one system, real-time visibility into what every sub is doing, producing, and encountering.
Daily Quantity Verification
Compare sub-reported quantities against inspector-verified measurements daily. Resolve disputes while the work is fresh and the evidence is clear.
Sequential Operations Coordinator
POD tracks dependencies between consecutive operations. When excavation falls behind, the pipe, backfill, and paving subs are automatically notified of the schedule impact.
Sub Safety Monitoring
Daily voice reports include safety observations about subcontractor operations. Identify safety violations from the daily report stream without relying on periodic site visits.
Key Features
Industry-Specific KPIs That Update Themselves
POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.
Safety Performance
Earned Value Performance
Both cost and schedule under pressure
These update in real time from a 5-minute voice report. No spreadsheets. No data entry.
Frequently Asked Questions
Ready to See POD in Action?
Watch a 270-day project unfold in 30 seconds.