Pour Day Reality

Stop Writing Concrete Pour Logs
By Hand in the Field

0
Forms Per Pour Day
0CY
Avg Yards Per Day
0%
% Data Lost on Paper
0
Min With POD

The Challenge

Batch tickets vanish by end of day

Paper batch tickets get wet, blow away, or end up in a pile nobody sorts. When QC asks for ticket 47 from last Tuesday, it is gone forever.

Temperature logs are fiction

ASTM requires concrete temp at placement. Your crew writes 72F on every line because they are too busy placing concrete to stop and measure.

Slump test timing is untracked

Slump tests need to happen within time windows. Paper logs record the test but never whether it happened on time or after the load sat for 90 minutes.

Pour sequence lost in translation

Which section was poured first? Where did the cold joint form? Pour sequence matters for structural integrity but paper logs just say placed concrete.

The POD Solution Path

1

Voice-log every truck arrival

Speak the ticket number, slump, temp, and placement location as each truck arrives. POD timestamps and organizes everything automatically.

Zero lost batch tickets
2

Real temperature documentation

POD prompts for actual temperature readings at placement. No more fictional 72F across every line of every pour log.

ASTM-compliant records
3

Automated timing compliance

POD tracks time between batching and placement. Loads approaching time limits trigger alerts before concrete goes bad.

Spec compliance
4

Pour sequence mapping

Voice notes capture placement location and sequence. Build a pour map that QC engineers and inspectors can actually reference.

Full traceability

Built for Concrete Crews

Load-by-Load Tracking

Every truck, every ticket, every test result linked to a specific pour location and timestamp.

QC Integration

Break schedules, cylinder IDs, and lab results all connected to the pour record.

Yield Analysis

Track actual vs. theoretical yield per pour. Catch overages and shortages before they become problems.

“We poured 400 yards on a Friday. By Monday nobody could find the batch tickets. With POD every load is voice-logged the second the truck backs up.”

— Concrete Superintendent, Heavy Civil Contractor

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Never Lose Another Batch Ticket

See how POD turns chaotic pour days into organized digital records.

Last updated: February 2026