Critical Lifts

Crane Lift Plans Still
Live on Paper

0
Crane Incidents/Year US
0
Forms Per Critical Lift
0
Hr Lost to Missing Docs
0
Min With POD

The Challenge

23 forms per critical lift

Lift plan, load chart review, rigging inspection, pre-lift meeting sign-off, signal person assignment, daily crane inspection, operator certification. Each one is a separate piece of paper.

Missing signatures shut down cranes

One missing signature on a daily inspection and OSHA can red-tag your crane. Your $40K/week crane sits idle because someone forgot to sign a form.

Rigging inspections are a formality

Pre-shift rigging inspections take 2 minutes on paper but should take 15 in reality. Crews check every box without actually inspecting because the form is an afterthought.

Signal person records are incomplete

Who was the qualified signal person for each lift? Paper records rarely capture this, creating OSHA exposure on every critical lift.

The POD Solution Path

1

Voice-captured lift documentation

Speak the lift details — load weight, radius, boom length, rigging configuration. POD populates the lift plan and flags any capacity concerns.

Instant lift plans
2

Digital inspection with prompts

Guided daily crane inspections that prompt each required check. No more skipping items. Digital signature captured on completion.

OSHA-ready records
3

Signal person tracking

Assign and track qualified signal persons for every lift. Certification verification built in. No more compliance gaps.

Full qualification tracking
4

Lift history dashboard

Every lift documented with load, configuration, crew, and conditions. Search any lift from any day instantly.

Instant audit response

Built for Crane Operations

Load Chart Integration

Capacity verification against manufacturer load charts for every lift configuration.

Weather Monitoring

Wind speed alerts tied to crane operations. Auto-flag when conditions exceed safe lift parameters.

Certification Tracking

Operator and rigger certifications tracked with expiration alerts. Never have an unqualified person on a crane.

“OSHA showed up and asked for our lift plan from Tuesday. We had the plan but not the daily inspection or signal person assignment. Two-hour delay. POD would have had it in 10 seconds.”

— Safety Director, Steel Erection Company

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Digitize Your Lift Planning

See how POD turns paper-based crane documentation into instant digital records.