Short-Term Planning

Your 3-Week Lookahead Is
Outdated by Tuesday

0
Hours Building Lookahead
0%
% Activities Slip Weekly
0%
% PMs Want Real-Time
0
Min Update With POD

The Challenge

2 hours to build, wrong by Tuesday

Monday morning you pull up the master schedule, check constraints, talk to subs, and build the lookahead. Tuesday a delivery slips and the whole thing needs rework.

Excel cannot handle field reality

Lookaheads live in spreadsheets with no connection to what actually happens each day. There is zero feedback loop from the field to the plan.

Subs ignore the lookahead anyway

34% of planned activities slip every week because subcontractors do not have visibility into the lookahead or it does not match their internal planning.

No early warning when activities slip

You find out an activity is behind on Friday when the sub tells you they need another week. No system flags the slippage in real time.

The POD Solution Path

1

Daily reports feed the lookahead

Every voice report captures progress, delays, and constraints. POD auto-updates the lookahead based on actual field conditions.

Always current
2

Activity completion tracking

See which activities are on track, which are slipping, and which have new constraints. Real-time visibility without manual updates.

Early warning on delays
3

Constraint alerts

Material deliveries, inspection holds, sub mobilization — POD flags constraints before they impact the lookahead schedule.

Proactive planning
4

Sub visibility

Share the live lookahead with subcontractors. They see their upcoming activities and can flag issues before they become schedule busters.

Sub coordination

Smarter Short-Term Planning

Auto-Generated Lookahead

POD builds the 3-week view from your daily reports and master schedule. No more Monday morning spreadsheet sessions.

Slip Detection

Activities trending behind get flagged automatically so you can intervene before they impact the critical path.

Constraint Tracking

Every constraint — materials, inspections, permits, sub availability — tracked and linked to affected activities.

“I used to rebuild my 3-week lookahead every Monday morning. Now POD generates it from my daily reports and it is actually accurate because it reflects what really happened in the field.”

— Project Engineer, Commercial GC

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Stop Rebuilding Your Lookahead Every Week

See how POD generates an always-current 3-week schedule from your daily reports.

Last updated: February 2026