Excavation Safety

Trenching and Shoring Logs
Cannot Be an Afterthought

$0K
K Avg OSHA Trench Fine
0
Trench Deaths in 2024
0%
% Paper Inspections Incomplete
0
Min With POD

The Challenge

Soil classification is a checkbox

Type A, B, or C soil? Your crew checks a box without testing. When OSHA asks how classification was determined, there is no documentation of the actual test.

Daily trench inspections are skipped

OSHA requires inspection before each shift and after every rain event. Paper forms get filled out at the end of the week, not daily as required.

Competent person records have gaps

Who was the competent person on site? What time were they present? Paper logs rarely capture this, and OSHA specifically looks for it.

Depth and slope measurements undocumented

Trench depth determines protective system requirements. Without daily measurement records, you cannot prove you met the standard.

The POD Solution Path

1

Voice-captured trench inspections

Walk the trench and speak the inspection: soil type, depth, slope ratio, protective system in place. POD timestamps and geolocates the record.

Real inspection records
2

Competent person verification

POD logs the competent person presence for every shift automatically. No more gaps in who was responsible for trench safety that day.

Complete CP documentation
3

Depth and slope tracking

Record actual measurements with each inspection. POD flags when depth exceeds protective system thresholds.

Measurement compliance
4

Weather event response

Rain detected? POD automatically triggers a re-inspection requirement and notifies the competent person.

Post-event compliance

Excavation Safety Made Rigorous

Trench Registry

Every excavation tracked with location, depth, soil classification, and protective system. Full lifecycle documentation.

OSHA Compliance Dashboard

See your trench inspection compliance rate in real time. Know which excavations need attention before OSHA does.

Inspection Reminders

Automatic reminders for daily inspections, post-storm re-inspections, and competent person assignments.

“We got cited because our competent person log had gaps. The inspector was on site but nobody documented his daily inspection. POD would have captured it with a voice note.”

— Safety Manager, Underground Contractor

Live Demo

Your Schedule and Budget — In Two Gauges

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Dual EVM Gauge

Earned Value Performance

Cost Performance
0.71.3
0.70
Performance
Critical
0.49CPI × SPI
Schedule Performance
0.71.3
0.70
Performance
Critical

Both cost and schedule under pressure

CPI
0.70
SPI
0.70
Cost Var-30.0%
Sched Var-30.0%
Composite0.490
EAC Factor1.429
BudgetOver Budget
ScheduleBehind
HealthAction Needed
PODProject DNA

Project DNA

POD
Construction
0HEALTH
Schedule0
Budget0
Safety0
Quality0
Resources0
Health0
Strongest0
Weakest0
Safety (95) leads, Resources (79) needs focus

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Protect Your Crews and Your Company

See how POD turns trench safety documentation from a liability into an asset.