Onshore Wind Farm Checklist

What to Include in a Onshore Wind Farm POD

The complete checklist — 22 sections, 285 fields, nothing missed.

0
Total Fields
0
Sections
0 min
Minutes to Complete
0
Export Formats

Complete Onshore Wind Farm POD Checklist

1Project Header20 fields

+ 16 more fields in this section

2Weather Delay Tracking6 fields

+ 2 more fields in this section

3Deliveries & Materials19 fields

+ 15 more fields in this section

4Civil / Roads28 fields

+ 24 more fields in this section

5Foundations41 fields

+ 37 more fields in this section

6Overhead Line (OHL) / Collector Line25 fields

+ 21 more fields in this section

7Underground Electrical / MV Collection15 fields

+ 11 more fields in this section

8Substation39 fields

+ 35 more fields in this section

9Turbine Erection21 fields

+ 17 more fields in this section

10Grounding13 fields

+ 9 more fields in this section

11O&M Building20 fields

+ 16 more fields in this section

12Manpower27 fields

+ 23 more fields in this section

13Equipment on Site28 fields

+ 24 more fields in this section

14Safety / HSE25 fields

+ 21 more fields in this section

15Environmental18 fields

+ 14 more fields in this section

16Quality22 fields

+ 18 more fields in this section

17Issues / Delays & Impacts17 fields

+ 13 more fields in this section

18Photos (Required Documentation)13 fields

+ 9 more fields in this section

19Schedule Tracking (3-Day Rolling)19 fields

+ 15 more fields in this section

20Commissioning Tracking24 fields

+ 20 more fields in this section

21Laydown Yard Tracking15 fields

+ 11 more fields in this section

22Site Visitors5 fields

+ 1 more fields in this section

Get the Full Onshore Wind Farm Template

All 22 sections and 285 fields, pre-configured and ready to use.

Frequently Asked Questions

A complete onshore wind farm POD should include 22 sections: Project Header, Weather Delay Tracking, Deliveries & Materials, Civil / Roads, Foundations, Overhead Line (OHL) / Collector Line, Underground Electrical / MV Collection, Substation, Turbine Erection, Grounding, O&M Building, Manpower, Equipment on Site, Safety / HSE, Environmental, Quality, Issues / Delays & Impacts, Photos (Required Documentation), Schedule Tracking (3-Day Rolling), Commissioning Tracking, Laydown Yard Tracking, Site Visitors. Each section captures field data specific to onshore wind farm construction.
A comprehensive onshore wind farm POD needs 285 fields across 22 sections. This is far more than the 20 to 30 fields in generic templates. POD provides a free template with all fields pre-configured.