Back online
Close-Out

Free As-Built Document Log Template

Track as-built drawing updates with redline status, digital conversion progress, and final as-built delivery requirements per drawing discipline.

Share:
Browse all templates
3
Tabs
6
Features
Yes
Print-Ready
Free
Cost

What's Included

This template includes 3 organized sections ready for your project.

1

Drawing Register

2

Status Dashboard

3

Delivery Checklist

Key Features

Everything you need to manage As-Built Document Log documentation professionally.

Drawing Register

Every project drawing with discipline, sheet number, and current as-built markup status

Redline Status

Track which drawings have field markups started, in progress, completed, or verified

Digital Conversion

Track scanning, CAD/BIM update status, and quality review for digitized as-builts

Discipline Tracking

Architectural, structural, mechanical, electrical, plumbing, site/civil tracked independently

Verification Checklist

Ensure as-builts show actual dimensions, routing, equipment locations, and hidden conditions

Delivery Tracking

Track format requirements (paper, PDF, CAD, BIM) and delivery status per contract

Why This Template Is Different

Built by construction professionals who manage real projects.

POD vs. Generic Templates

Built for construction
Generic officePurpose-built
Auto-calculations
ManualAutomatic
Print formatting
BasicProfessional
Related document links
NoYes
AI integration
NoPlan of Day
Cost
FreeFree

Close-Out-Specific Design

Designed for construction project management workflows
3 organized sections covering all critical data
Print-optimized with professional formatting and page breaks
Auto-calculations reduce manual errors and save time

Templates Are Just the Beginning

Plan of Day's AI platform turns this template into a living, intelligent document.

Before

Static template

Manual data entry into spreadsheet cells
No trend tracking or historical comparison
Static document with no intelligence
Copy-paste to distribute to stakeholders
No alerts when items are overdue or at risk

After

AI-powered Plan of Day

POD reads the files you already produce
Your project metrics tracked automatically
AI agents flag overdue items, risks, and anomalies
Instant distribution to your entire team
Trend analysis and predictive insights across all projects

What Makes an As-Built Set Legally Defensible

An as-built set holds up when every deviation from the contract drawings was marked at the time the work was installed, dated, initialed, and tied to the document that caused it. A set rebuilt from memory at closeout cannot show when or how anything was measured, and that is the first thing questioned in a dispute.

Red-Line Discipline in the Field

01

Mark it the day it is built

Red-line the field set while the trench is open and the ceiling is still down. A markup drawn from memory at month-end is a guess, and a guess cannot be checked once the work is covered.

02

Date and initial every change

Each markup carries the date, the initials of the person who measured it, and the RFI, change order, or field directive that caused it. That trail is what lets a later reader trust the line.

03

Hold one color convention

Use the convention the specification sets and post it on the cover sheet. A common one is red for added work, green for removed work, and blue for notes. Every trade on the job follows the same legend.

From Red-Lines to Record Drawings

Contractor As-Builts

The marked-up field set

Kept by the contractor and each trade on one dedicated set that never leaves the site office
Hand or digital markups made as the work is installed, from field measurement
The contractor stands behind the accuracy, usually with a signed certification at turnover
Often reviewed with each pay application under the project record documents section of the specification

Record Drawings

The incorporated design set

Prepared by the architect or engineer, who drafts the contractor markups into the CAD files or model
Only as accurate as the red-lines handed over, because the designer did not measure the installed work
Commonly issued with a note that the content relies on information supplied by the contractor
The set the owner keeps for operations, renovations, and future tie-ins

The handoff is where detail gets lost. Turn over legible, complete sheets by discipline, log the date each one was transmitted, and keep a copy of the marked-up originals after the record set is issued.

What Owners and Inspectors Ask For at Closeout

Dimensioned deviations

Where the work moved from the contract drawings, show the installed dimension from a fixed reference such as a column line or building corner. A cloud with the word moved is not a record.

Buried and concealed utilities

Horizontal location tied to at least two permanent features, depth of cover or invert elevation, pipe size and material, and the tie-in point to the existing system. The same applies to conduit and piping cast in slabs or closed inside walls.

Substituted materials and equipment

The manufacturer and model actually installed, referenced to the approved submittal or substitution request, so the record set matches the O&M manuals and the warranty file.

Final MEP routing

Duct, pipe, and conduit mains as installed after coordination, with valves, dampers, cleanouts, junction boxes, and access panels located where a maintenance crew will look for them.

Requirements differ by contract and jurisdiction. Many building departments and utilities ask for as-built documentation of site utilities, stormwater, and fire protection work before final acceptance, and many contracts hold final payment until the record documents are accepted. Read the closeout section of your specification before the first markup is due.

As-Built Failures That Cost Money Later

Each one is cheap to prevent during construction and expensive to fix after turnover

Concealed conditions never recorded

An abandoned line, an unexpected footing, or a rerouted sleeve gets covered without a markup. The next contractor finds it with an excavator or a core drill, and the owner pays for the discovery twice.

No changes claimed on a job that changed

A sheet stamped no changes sits beside a file of RFIs and change orders that touched it. One contradiction like that puts the accuracy of the whole set in question during a dispute.

Underground with no elevations

A plan-view line shows where a pipe runs but not how deep. Without inverts or depth of cover, the next tie-in starts with potholing, and a strike on a live line becomes a real risk.

Frequently Asked Questions

As-built drawings (also called record drawings) are the final set of drawings that reflect all changes made during construction. They show the actual installed conditions including dimensional changes, routing modifications, equipment relocations, and concealed conditions — providing an accurate record of what was actually built.

The contractor and each subcontractor are typically responsible for maintaining current redlines on their respective drawings throughout construction. The template tracks responsibility assignments and ensures every trade is keeping their markups current, not waiting until closeout.

Contract requirements vary — common formats include marked-up PDF copies, updated CAD files (DWG/DXF), updated BIM models (RVT/IFC), and sometimes printed paper sets. The delivery checklist tracks the required format per discipline and confirms each has been delivered.