Back online
Safety

Free JSA / JHA Template

Create Job Safety Analyses and Job Hazard Analyses with step-by-step hazard identification, risk ratings, control measures, and crew acknowledgment.

Share:
Browse all templates
3
Tabs
6
Features
Yes
Print-Ready
Free
Cost

What's Included

This template includes 3 organized sections ready for your project.

1

JSA Form

2

Hazard Register

3

Crew Sign-Off

Key Features

Everything you need to manage JSA / JHA documentation professionally.

Step-by-Step Breakdown

Break each task into sequential steps with hazards and controls identified for each step

Risk Rating Matrix

Probability × Severity matrix for each hazard with pre-control and post-control ratings

Control Hierarchy

Structured controls following elimination, substitution, engineering, administrative, PPE hierarchy

Crew Acknowledgment

Sign-off section for every crew member confirming they reviewed and understood the JSA

PPE Requirements

Required PPE listed per task step with visual icons for quick reference

Emergency Procedures

Task-specific emergency contacts, assembly points, and first aid requirements

Why This Template Is Different

Built by construction professionals who manage real projects.

POD vs. Generic Templates

Built for construction
Generic officePurpose-built
Auto-calculations
ManualAutomatic
Print formatting
BasicProfessional
Related document links
NoYes
AI integration
NoPlan of Day
Cost
FreeFree

Safety-Specific Design

Designed for construction project management workflows
3 organized sections covering all critical data
Print-optimized with professional formatting and page breaks
Auto-calculations reduce manual errors and save time

Templates Are Just the Beginning

Plan of Day's AI platform turns this template into a living, intelligent document.

Before

Static template

Manual data entry into spreadsheet cells
No trend tracking or historical comparison
Static document with no intelligence
Copy-paste to distribute to stakeholders
No alerts when items are overdue or at risk

After

AI-powered Plan of Day

POD reads the files you already produce
Your project metrics tracked automatically
AI agents flag overdue items, risks, and anomalies
Instant distribution to your entire team
Trend analysis and predictive insights across all projects

How to Write a JSA: Steps, Hazards, Controls

A Job Safety Analysis works in three passes over the same job. Break the job into sequential steps, identify the hazards in each step, then define a control for each hazard. The form in this template is laid out in that order, one row per step.

Pass 1

Break the job into steps

List the job in the order the crew actually performs it. Start each step with an action verb and describe what is done, not how. If a step hides several actions, split it. If the list runs so long that nobody will read it, the job is probably two jobs.

Example: Position the ladder. Climb to work height. Drill the anchor holes.

Pass 2

Identify the hazards in each step

Take one step at a time and ask what could go wrong. Look for struck-by, caught-between, fall, electrical, overexertion, and exposure hazards. Include the surroundings as well as the task: overhead lines, traffic, other trades, weather.

Example: Drilling overhead creates silica dust and a dropped-tool hazard for anyone below.

Pass 3

Define a control for each hazard

Every hazard gets its own control, written as a specific action that someone on the crew can do and a supervisor can verify. "Be careful" is not a control. Pick the control from the highest level of the hierarchy that is practical for the job.

Example: Use a drill with a dust shroud and vacuum. Barricade the area below.

Choose Controls in This Order

The hierarchy of controls ranks controls by how reliably they protect people. Start at the top for every hazard and move down only when the level above is not practical. Protective equipment comes last because it does nothing to the hazard itself and depends on every person wearing it correctly every time.

  1. 1

    Elimination

    Most effective

    Remove the hazard completely so nobody is exposed to it.

    Assemble the section on the ground so no one has to work at height.

  2. 2

    Substitution

    Replace the hazard with something less hazardous.

    Swap a solvent-based product for a water-based one.

  3. 3

    Engineering controls

    Put a physical barrier or device between people and the hazard.

    Guardrails, machine guards, trench shoring, local exhaust ventilation.

  4. 4

    Administrative controls

    Change the way people work around a hazard that is still present.

    Written procedures, training, signage, a spotter, limits on exposure time.

  5. 5

    Personal protective equipment

    Last line of defense

    Protect the individual worker when the hazard cannot be controlled any other way.

    Harness and lanyard, respirator, face shield, cut-resistant gloves.

Who Writes It and Who Signs It

The crew doing the work helps write it. They know how the job is really done and where the shortcuts are.
The supervisor or foreman leads it together with a competent person: someone able to identify existing and predictable hazards and authorized to correct them promptly.
It is written before the job starts and reviewed at the work location, where the crew can see the conditions it describes.
Every crew member signs it. A signature means the person reviewed the steps, hazards, and controls. It is not an attendance record.
Anyone who joins the job later reviews and signs it before starting work.

When to Stop and Revise It

A JSA describes one job under one set of conditions. When either changes, stop work, update the affected steps, and have the crew review and sign again.

A step is added, removed, or done in a different order.
Conditions change: weather, lighting, ground conditions, or other trades working nearby.
Different equipment, tools, or materials are brought in.
A near-miss or incident occurs on the job.

JSA, Permit, or Toolbox Talk?

The three documents are often filled out on the same morning, but each one answers a different question. A job can need all three.

JSA / JHA

An analysis

What can hurt us on this job, step by step, and what will we do about each hazard?

Written for one job and covering every step. It stays with the crew for as long as the job and its conditions stay the same.

Work permit

An authorization

Are we cleared to start this high-hazard activity right now?

Issued by an authorized person for a specific activity such as hot work or confined space entry, for a limited time, after set conditions are verified. A JSA often shows that a permit is needed. It never replaces one.

Toolbox talk

A conversation

Does everyone on the crew understand today's topic?

A short crew briefing on a single safety topic. It communicates and reminds, but it does not analyze a job step by step. Walking the crew through the JSA makes a strong toolbox talk.

Frequently Asked Questions

JSA (Job Safety Analysis) and JHA (Job Hazard Analysis) are essentially the same document. Both break a task into steps, identify hazards at each step, and define control measures. Different companies and regions use different terms, but the process is identical.

The JSA should be prepared by the supervisor or foreman who understands the task, reviewed by the safety team, and signed by every crew member performing the work. It should be completed before the task begins and reviewed again if conditions change.

Each step should be specific enough to identify unique hazards but not so detailed that the JSA becomes unwieldy. Typically 5-12 steps per task. If a task needs more than 15 steps, consider breaking it into separate JSAs.

Get Your Free JSA / JHA Template

Quick signup. Free download. Ready to use on your next project.

Last updated: November 2026