Free T&M Ticket Template
Document Time & Material work with labor hours, equipment rates, material costs, daily signatures, and automatic cost calculations.
What's Included
This template includes 3 organized sections ready for your project.
T&M Ticket Form
T&M Summary Log
Cost Rollup
Key Features
Everything you need to manage t&m ticket documentation professionally.
Labor Tracking
Worker name, trade, hours (ST/OT/DT), hourly rate, and calculated cost per worker per day
Equipment Rates
Equipment type, hours operated, hourly/daily rate, and operator status (operated or bare rental)
Material Costs
Material description, quantity, unit cost, markup percentage, and extended total
Daily Signatures
Contractor and owner representative signatures on each daily T&M ticket for real-time verification
Auto-Calculated Totals
Running totals for labor, equipment, materials, and markups across all T&M tickets
CO Reference
Link each T&M ticket to its authorizing change order or verbal directive for audit trail
Why This Template Is Different
Built by construction professionals who manage real projects.
POD vs. Generic Templates
Operations-Specific Design
Templates Are Just the Beginning
Plan of Day's AI platform turns this template into a living, intelligent document.
Before
Static template
After
AI-powered Plan of Day
Frequently Asked Questions
A Time & Material (T&M) ticket documents labor, equipment, and materials used for extra work that is compensated on an actual-cost basis rather than a lump sum. T&M tickets must be signed daily by both the contractor and the owner's representative to verify the resources used.
Daily signatures from both parties prevent disputes about what resources were actually used. Without timely verification, T&M claims become difficult to substantiate months later when the change order is finalized. The template includes signature blocks for each daily ticket.
The template applies contractual markup percentages for labor burden, overhead, and profit separately. Typical markups are 15-20% for overhead and 10-15% for profit on self-performed work, with lower markups on subcontractor pass-through. All markups are configurable per contract terms.
Get Your Free T&M Ticket Template
Quick signup. Instant download. Ready to use on your next project.