Back online
Operations

Free T&M Ticket Template

Document Time & Material work with labor hours, equipment rates, material costs, daily signatures, and automatic cost calculations.

3
Tabs
6
Features
Yes
Print-Ready
Free
Cost

What's Included

This template includes 3 organized sections ready for your project.

1

T&M Ticket Form

2

T&M Summary Log

3

Cost Rollup

Key Features

Everything you need to manage t&m ticket documentation professionally.

Labor Tracking

Worker name, trade, hours (ST/OT/DT), hourly rate, and calculated cost per worker per day

Equipment Rates

Equipment type, hours operated, hourly/daily rate, and operator status (operated or bare rental)

Material Costs

Material description, quantity, unit cost, markup percentage, and extended total

Daily Signatures

Contractor and owner representative signatures on each daily T&M ticket for real-time verification

Auto-Calculated Totals

Running totals for labor, equipment, materials, and markups across all T&M tickets

CO Reference

Link each T&M ticket to its authorizing change order or verbal directive for audit trail

Why This Template Is Different

Built by construction professionals who manage real projects.

POD vs. Generic Templates

Built for construction
Generic officePurpose-built
Auto-calculations
ManualAutomatic
Print formatting
BasicProfessional
Related document links
NoYes
AI integration
NoPlan of Day
Cost
FreeFree

Operations-Specific Design

Designed for construction project management workflows
3 organized sections covering all critical data
Print-optimized with professional formatting and page breaks
Auto-calculations reduce manual errors and save time

Templates Are Just the Beginning

Plan of Day's AI platform turns this template into a living, intelligent document.

Before

Static template

Manual data entry into spreadsheet cells
No trend tracking or historical comparison
Static document with no intelligence
Copy-paste to distribute to stakeholders
No alerts when items are overdue or at risk

After

AI-powered Plan of Day

AI auto-populates fields from voice reports and uploads
Hundreds of KPIs calculated from your data automatically
AI agents flag overdue items, risks, and anomalies
Instant distribution to your entire team
Trend analysis and predictive insights across all projects

Frequently Asked Questions

A Time & Material (T&M) ticket documents labor, equipment, and materials used for extra work that is compensated on an actual-cost basis rather than a lump sum. T&M tickets must be signed daily by both the contractor and the owner's representative to verify the resources used.

Daily signatures from both parties prevent disputes about what resources were actually used. Without timely verification, T&M claims become difficult to substantiate months later when the change order is finalized. The template includes signature blocks for each daily ticket.

The template applies contractual markup percentages for labor burden, overhead, and profit separately. Typical markups are 15-20% for overhead and 10-15% for profit on self-performed work, with lower markups on subcontractor pass-through. All markups are configurable per contract terms.

Get Your Free T&M Ticket Template

Quick signup. Instant download. Ready to use on your next project.

Last updated: April 2026