Back online
Energy & Power

Free Onshore Wind Repowering POD Template

293 fields. 19 sections. Free in Excel, PDF, or HTML. Built for onshore wind repowering — teardown, salvage, reused foundations, re-erection, and capacity uplift.

0
Fields
0
Sections
0
Role Variants
0
Export Formats

What's Inside This Template

19 sections covering every aspect of onshore wind repowering daily reporting.

Project Header

20 fields

Track project name, project number / contract #, report date, report #, and more

Weather Delay Tracking

6 fields

Track days precipitation delayed work, days wind delayed lifts, days lightning/weather delayed work, total weather delay days, and more

Outage / Curtailment Window

8 fields

Track outage window start / end, days remaining in window, units offline today, units returned to service, curtailment / downtime, revenue-at-risk, and more

Turbine Removals & Teardown

14 fields

Track turbine id, de-energized, lockout/tagout verified, stored-energy isolation, dropped-object exclusion zone, blades / nacelle / tower sections removed - today & jtd, turbines fully removed, and more

Component Salvage & Recycling

11 fields

Track steel tower recycled, copper / cable recycled, nacelle / gearbox salvaged, blades diverted to recycling, blades to landfill, landfill diversion rate, salvage value, chain-of-custody, and more

Foundation Reuse & Modification

10 fields

Track foundation id, inspected, reuse decision (as-is / modify / replace), anchor bolt condition, pedestal modification, load re-rated for new WTG, foundations reused vs modified, and more

Deliveries & Materials

19 fields

Track new (larger) tower sections received, nacelles received, longer blades received, hardware and consumables, laydown staging, and more

Re-erection (New Turbines)

12 fields

Track turbine id, new WTG offload, base / mid / top sections set, nacelle set, blades hung, rotor star assembled, turbines re-erected - jtd / %, crane hours, lift window status, and more

Re-energization & Commissioning

10 fields

Track mechanical completion, electrical terminations, protection & control settings, utility witness test scheduled & passed, first rotation, turbines re-energized - jtd / %, punch items, and more

Capacity Uplift Tracking

9 fields

Track turbine count before / after, nameplate MW before / after, MW gained, rotor diameter and hub height before / after, AEP uplift estimate, PTC/ITC re-qualification basis, and more

Manpower

27 fields

Track gc / owner - supervision, gc / owner - management, sub 1 - company name, sub 1 - trade / scope, and more

Equipment on Site

28 fields

Track removal crane - type / capacity, main crane - hours operated, main crane - hours idle, assist crane - type / capacity, and more

Safety / HSE

25 fields

Track daily safety topic, all-hands safety topic, safety topic attendees, site orientations given, and more

Environmental

18 fields

Track swppp / erosion control inspection, spill inspection, hazardous material recovery, recycling manifests, species-at-risk observations, and more

Quality

22 fields

Track inspections conducted, inspections passed, inspections failed, drawing revision tracking, and more

Issues / Delays & Impacts

17 fields

Track issue source, issue description, issue date identified, notice to owner issued, and more

Photos (Required Documentation)

13 fields

Track weather board photo, crew / tailgate meeting photo, teardown progress photos, re-erection progress photos, and more

Schedule Tracking (3-Day Rolling)

19 fields

Track yesterday - actual work completed, today - planned work, tomorrow - forecast work, activity - jtd, and more

Site Visitors

5 fields

Track visitor name, visitor company / organization, visitor purpose, visitor sign-in time, and more

Why This Template Is Different

Built by construction professionals who understand onshore wind repowering projects.

This Template vs Generic

Fields
20–30293
Industry-specific sections
NoYes
Compliance coverage
BasicOSHA 1926, NFPA 70E, NEC, NERC, EPA/CEAA, IEEE 1547
Role variants
15
Formats
Excel onlySheets, Excel, PDF, HTML
Cost
FreeFree

Onshore Wind Repowering-Specific Features

OSHA 1926, NFPA 70E, NEC, NERC, EPA/CEAA, IEEE 1547 compliance fields built in
19 sections tailored to onshore wind repowering workflows
Every field mapped to a safety or performance metric
5 role variants: Superintendent, Foreman, PM, Safety, QC

This template has 293 fields. Generic templates have 20–30.

That's 12× more coverage for onshore wind repowering projects.

This Template Takes 45 Minutes to Fill Out

Plan of Day's AI platform generates this entire document from a 5-minute voice report.

Before

Manual template

Open spreadsheet, type 293 fields
45 minutes per report
Static document with no insights
Copy-paste to distribute
No trend tracking or alerts

After

AI-powered Plan of Day

Speak for 5 minutes — AI fills every field
Auto-generated POD in seconds
Hundreds of KPIs calculated automatically
AI alerts for safety, budget, schedule risks
Instant distribution to entire team

Frequently Asked Questions

A repowering report has to carry the teardown and the rebuild at once. This Onshore Wind Repowering Plan of Day (POD) includes: Project Header, Weather Delay Tracking, Outage / Curtailment Window, Turbine Removals & Teardown, Component Salvage & Recycling, Foundation Reuse & Modification, Deliveries & Materials, Re-erection (New Turbines), Re-energization & Commissioning, Capacity Uplift Tracking, Manpower, Equipment on Site, Safety / HSE, Environmental, Quality, Issues / Delays & Impacts, Photos, Schedule Tracking (3-Day Rolling), and Site Visitors. It captures what a greenfield template drops — the removals, the salvage and recycling, the reused foundations, and the MW gained — and addresses OSHA 1926, NFPA 70E, NEC, NERC, EPA/CEAA, and IEEE 1547 requirements.

A new-build template only reports the erection. This repowering template adds the demolition half — Turbine Removals & Teardown, Component Salvage & Recycling, and Foundation Reuse & Modification — plus Capacity Uplift Tracking (MW before vs after) and an Outage / Curtailment Window section, because a repower is usually done against a downtime window. It has 293 fields across 19 sections, tuned for turbine replacement on a reused site rather than a greenfield build.

Yes, completely free. Download it as Excel (.xlsx), a fillable PDF, or HTML — no email, no account, no trial period. The template includes all 293 fields across 19 sections, built for teardown, salvage, foundation reuse, re-erection, and capacity uplift.

Get Your Free Onshore Wind Repowering Template

One click. No email. No account. 293 fields ready to go.

Try the AI-Powered Demo

Last updated: July 2026