Free Onshore Wind Repowering POD Template
293 fields. 19 sections. Free in Excel, PDF, or HTML. Built for onshore wind repowering — teardown, salvage, reused foundations, re-erection, and capacity uplift.
What's Inside This Template
19 sections covering every aspect of onshore wind repowering daily reporting.
Project Header
20 fieldsTrack project name, project number / contract #, report date, report #, and more
Weather Delay Tracking
6 fieldsTrack days precipitation delayed work, days wind delayed lifts, days lightning/weather delayed work, total weather delay days, and more
Outage / Curtailment Window
8 fieldsTrack outage window start / end, days remaining in window, units offline today, units returned to service, curtailment / downtime, revenue-at-risk, and more
Turbine Removals & Teardown
14 fieldsTrack turbine id, de-energized, lockout/tagout verified, stored-energy isolation, dropped-object exclusion zone, blades / nacelle / tower sections removed - today & jtd, turbines fully removed, and more
Component Salvage & Recycling
11 fieldsTrack steel tower recycled, copper / cable recycled, nacelle / gearbox salvaged, blades diverted to recycling, blades to landfill, landfill diversion rate, salvage value, chain-of-custody, and more
Foundation Reuse & Modification
10 fieldsTrack foundation id, inspected, reuse decision (as-is / modify / replace), anchor bolt condition, pedestal modification, load re-rated for new WTG, foundations reused vs modified, and more
Deliveries & Materials
19 fieldsTrack new (larger) tower sections received, nacelles received, longer blades received, hardware and consumables, laydown staging, and more
Re-erection (New Turbines)
12 fieldsTrack turbine id, new WTG offload, base / mid / top sections set, nacelle set, blades hung, rotor star assembled, turbines re-erected - jtd / %, crane hours, lift window status, and more
Re-energization & Commissioning
10 fieldsTrack mechanical completion, electrical terminations, protection & control settings, utility witness test scheduled & passed, first rotation, turbines re-energized - jtd / %, punch items, and more
Capacity Uplift Tracking
9 fieldsTrack turbine count before / after, nameplate MW before / after, MW gained, rotor diameter and hub height before / after, AEP uplift estimate, PTC/ITC re-qualification basis, and more
Manpower
27 fieldsTrack gc / owner - supervision, gc / owner - management, sub 1 - company name, sub 1 - trade / scope, and more
Equipment on Site
28 fieldsTrack removal crane - type / capacity, main crane - hours operated, main crane - hours idle, assist crane - type / capacity, and more
Safety / HSE
25 fieldsTrack daily safety topic, all-hands safety topic, safety topic attendees, site orientations given, and more
Environmental
18 fieldsTrack swppp / erosion control inspection, spill inspection, hazardous material recovery, recycling manifests, species-at-risk observations, and more
Quality
22 fieldsTrack inspections conducted, inspections passed, inspections failed, drawing revision tracking, and more
Issues / Delays & Impacts
17 fieldsTrack issue source, issue description, issue date identified, notice to owner issued, and more
Photos (Required Documentation)
13 fieldsTrack weather board photo, crew / tailgate meeting photo, teardown progress photos, re-erection progress photos, and more
Schedule Tracking (3-Day Rolling)
19 fieldsTrack yesterday - actual work completed, today - planned work, tomorrow - forecast work, activity - jtd, and more
Site Visitors
5 fieldsTrack visitor name, visitor company / organization, visitor purpose, visitor sign-in time, and more
Why This Template Is Different
Built by construction professionals who understand onshore wind repowering projects.
This Template vs Generic
Onshore Wind Repowering-Specific Features
This template has 293 fields. Generic templates have 20–30.
That's 12× more coverage for onshore wind repowering projects.
This Template Takes 45 Minutes to Fill Out
Plan of Day's AI platform generates this entire document from a 5-minute voice report.
Before
Manual template
After
AI-powered Plan of Day
Frequently Asked Questions
A repowering report has to carry the teardown and the rebuild at once. This Onshore Wind Repowering Plan of Day (POD) includes: Project Header, Weather Delay Tracking, Outage / Curtailment Window, Turbine Removals & Teardown, Component Salvage & Recycling, Foundation Reuse & Modification, Deliveries & Materials, Re-erection (New Turbines), Re-energization & Commissioning, Capacity Uplift Tracking, Manpower, Equipment on Site, Safety / HSE, Environmental, Quality, Issues / Delays & Impacts, Photos, Schedule Tracking (3-Day Rolling), and Site Visitors. It captures what a greenfield template drops — the removals, the salvage and recycling, the reused foundations, and the MW gained — and addresses OSHA 1926, NFPA 70E, NEC, NERC, EPA/CEAA, and IEEE 1547 requirements.
A new-build template only reports the erection. This repowering template adds the demolition half — Turbine Removals & Teardown, Component Salvage & Recycling, and Foundation Reuse & Modification — plus Capacity Uplift Tracking (MW before vs after) and an Outage / Curtailment Window section, because a repower is usually done against a downtime window. It has 293 fields across 19 sections, tuned for turbine replacement on a reused site rather than a greenfield build.
Yes, completely free. Download it as Excel (.xlsx), a fillable PDF, or HTML — no email, no account, no trial period. The template includes all 293 fields across 19 sections, built for teardown, salvage, foundation reuse, re-erection, and capacity uplift.
Get Your Free Onshore Wind Repowering Template
One click. No email. No account. 293 fields ready to go.
Related Energy & Power Templates
Last updated: July 2026