One Missed Notice. One Voided Claim.
$2.4 Million Gone.

Your contract required written notice within 7 days of the changed condition. Your PM found out on day 12. That $2.4M delay claim? Voided. Not because you were wrong — because you were late.

0
Days to File Notice
$0M
Average Claim at Risk
0
Procore Notice Modules
0hr
POD Alert Window

The Silent Claim Killer

Four reasons your best claims die before they reach the negotiation table

01

Hidden Deadlines

Your contracts have 15-20 different notice provisions buried in legal language. Each has a different deadline (3 days, 7 days, 14 days). Nobody tracks them all.

02

No Clause Tracking

Procore doesn't parse contracts for notice requirements. It doesn't know the difference between a 7-day differing site condition notice and a 14-day delay notification.

03

Evidence Gaps

When you finally discover a claimable event, the evidence trail is cold. Daily logs from 2 weeks ago weren't written with the claim in mind.

04

Voided Claims

More claims are lost to missed notice deadlines than to weak merit. The window closes silently, and no system alerts you.

How POD Protects Every Claim Dollar

Notice Deadline Calendar

Every contractual notice provision extracted, tracked, and counted down. You see every deadline across every contract — 3-day, 7-day, 14-day windows — on one calendar.

Notice Chain Visualization

From triggering event to written notice to owner response to resolution. POD visualizes the entire notice chain so nothing falls through.

Excusable Event Pipeline

Force majeure events, differing site conditions, owner-caused delays — POD tracks each from initial event through entitlement calculation to change order conversion.

Evidence Strength Gauge

POD scores your evidence package strength — daily logs, photos, weather data, correspondence — before you file. No more submitting weak claims.

The Notice Deadline Timeline

Watch contractual deadlines drop, count down, and either protect your claim or shatter it

Day 0Day 3Day 7Day 10Day 14Differing SiteConditionDelayNotificationForceMajeureChangedWork ScopeEvent OccursDeadline Window ClosesNotice Filed On TimeMissed Deadline — Claim Voided

Claims Protection Intelligence — Every Deadline, Every Dollar

Notice calendars and excusable event pipelines that never let a deadline pass unnoticed

Notice Deadlines

POD
1 Overdue
N-018
Delay
Concrete pour delay — weather impact
Ref: EE-042
OVERDUE
N-021
Change
Owner-directed scope addition — Level 4 MEP
Ref: EE-045
1 day
N-022
Claim
Differing site conditions — rock at 8ft
Ref: EE-046
2 days
N-019
Force Majeure
Wind event exceeding 60mph threshold
4 days
N-023
Delay
RFI response delay — structural engineer
6 days
N-024
Change
Design revision — curtain wall details
10 days
N-025
Claim
Acceleration costs — owner-directed
16 days
N-026
Delay
Permit delay — fire marshal review
23 days
1
Overdue
3
Due This Wk
7
Due This Mo

EE-to-CO Pipeline

POD
9 Active
Event Occurs
Notice Sent
Impact Documented
TE Requested
CO Submitted
Resolution
9
Active EEs
0%
CO Rate
34d
Avg Resolution
12 excusable events recorded — 33% result in change orders (avg 34 days from event to resolution)
What we hear from the industry: “We had a legitimate $1.8M delay claim denied because our PM didn't file written notice within 7 days. The daily logs proved the delay. The photos proved the cause. But the contract said 7 days, and we filed on day 11. Gone.”

— The problem POD was built to solve

Frequently Asked Questions

Never Lose a Claim to a Missed Deadline.

See how POD counts down every contractual notice window and protects every dollar of your claims.