Commercial & Institutional Template

Commercial Building Daily Report Template

220+ fields across 13+ sections. IBC, ADA, ASHRAE 90.1 compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Commercial Building

Construction Daily Report — 7 industry sections + 8 common sections

0
Total Fields
96
Industry Fields
98
Common Fields
42
KPI Mapped
IBCADAASHRAE 90.1NFPA 13/72Local Building Code
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Commercial Building — Industry Sections (96 fields)

Field NameTypeUnitRequiredPOD KPI
Excavation VolumeNumberCYRequiredCostPerInstallUnit
Shoring / UnderpinningEnumN/A / In Progress / CompleteRequired (if applicable)
DewateringEnumN/A / Active / CompleteRequired (if applicable)
Spread Footings PouredIntegercountRequiredCostPerInstallUnit
Mat Foundation — VolumeNumberCYRequired (if mat)
Grade Beams PouredIntegercountRequired
Pile InstallationIntegerpilesRequired (if deep foundation)
Foundation Wall PouredNumberLFRequired
Waterproofing AppliedNumberSFRequired
Waterproofing TypeEnumSheet/Fluid-Applied/BentoniteRequired
Backfill — VolumeNumberCYRequired
Underslab DrainageNumberLFRequired
Vapor BarrierNumberSFRequired
Slab-on-Grade PouredNumberSFRequiredCostPerInstallUnit
Field NameTypeUnitRequiredPOD KPI
Concrete PlacedNumberCYRequiredCostPerInstallUnit
Concrete Mix #TextRequired
Floor / Pour LocationTextRequired
Slump TestNumberinchesRequiredInspectionFirstPassRate
Air ContentNumber%Required
Concrete TemperatureNumber°FRequired
Cylinders CastIntegercountRequired
Rebar PlacedNumbertonsRequired
PT (Post-Tension) Tendons StressedIntegertendonsRequired (if PT slab)
PT — Elongation VerifiedEnumPass/FailRequired (if PT)InspectionFirstPassRate
Formwork / Shoring InstalledNumberSFRequired
Formwork / Shoring StrippedNumberSFRequired
Column PoursIntegercountRequired
Beam PoursIntegercountRequired
Field NameTypeUnitRequiredPOD KPI
Steel ErectedNumbertonsRequiredCostPerInstallUnit
Pieces ErectedIntegercountRequired
Column InstalledIntegercountRequired
Beam / Girder InstalledIntegercountRequired
Decking InstalledNumberSFRequired
Decking TypeEnumComposite/Non-Composite/FormRequired
Shear Studs WeldedIntegercountRequired (composite)
Shear Stud — Bend TestIntegertestedRequired (AISC)InspectionFirstPassRate
Bolted ConnectionsIntegerconnectionsRequired
Bolt Tensioning VerifiedIntegerconnectionsRequired (RCSC)
Field WeldingNumberinchesRequired (AWS D1.1)
Weld — NDT InspectionEnumPass/FailRequiredInspectionFirstPassRate
Fireproofing AppliedNumberSFRequired
Fireproofing TypeEnumSFRM/Intumescent/BoardRequired
Fireproofing Thickness VerifiedBooleanY/NRequired
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry