Commercial & Institutional Template

Office Building Daily Report Template

210+ fields across 12+ sections. IBC, ASHRAE 90.1, LEED compliant. Preview every field below — subscribe to download.

PLAN OF DAY
POD Daily Report Template

Office Building

Construction Daily Report — 2 industry sections + 8 common sections

0
Total Fields
18
Industry Fields
98
Common Fields
40
KPI Mapped
IBCASHRAE 90.1LEEDADA
© 2026 Plan of Day, Inc. All rights reserved.planofday.com

Common Sections (98 fields shared across all industries)

Office Building — Industry Sections (18 fields)

Field NameTypeUnitRequiredPOD KPI
Demising Wall FramedNumberLFRequiredCostPerInstallUnit
Office PartitionNumberLFRequired
Glass Front / Storefront (interior)NumberLFRequired
Raised Access FloorNumberSFRequired (if applicable)
Ceiling Grid / TileNumberSFRequired
Specialty Ceiling (open/wood/metal)NumberSFBest Practice
Conference Room AV Rough-InIntegerroomsRequired
Server / IDF Room Build-OutIntegerroomsRequired
Kitchen / Break RoomEnumN/S / In Progress / CompleteRequired
Restroom — ADA CompliantIntegerroomsRequired (ADA)InspectionFirstPassRate
Field NameTypeUnitRequiredPOD KPI
BAS/BMS Points ProgrammedIntegerpointsRequired
Access Control (card reader)IntegerdoorsRequired
CCTV CameraIntegercamerasRequired
Parking Garage — Ventilation (CO detect)EnumN/A / Installed / TestedRequired (if garage)
Lobby / Common Area FinishEnumN/S / In Progress / CompleteRequired
Elevator — Cab FinishEnumN/S / In Progress / CompleteRequired
Signage / WayfindingIntegersignsRequired (ADA)
EV Charging (garage)IntegerstationsBest Practice
Subscribe to download this template

5 Role Variants Available

GC / EPC
200-300
fields · Complete master report
Owner / Client
40-60
fields · Executive summary
Subcontractor
50-80
fields · Trade-specific
Safety / HSE
60-80
fields · Deep safety detail
Foreman / Field
30-50
fields · Quick field entry

Frequently Asked Questions

Last updated: March 2026