Nuclear SMR

NRC 10 CFR Compliance Requires 183 Daily Documentation Fields
Here\'s How to Fix It.

POD\\\'s nuclear SMR template covers 10 CFR 50 Appendix B, ASME NQA-1 records, and ITAAC closure in 342 fields.

0
NRC-Required Daily Fields
0+
Total Fields Per Report
0
M Avg NRC Delay Cost/Month
0
Min Voice Report

The Documentation Gaps

10 CFR 50 Appendix B quality records are a separate universe from daily reports

Nuclear quality assurance under Appendix B requires documented material traceability, qualified procedures, inspection records, and nonconformance reports. Construction daily reports run on a parallel track — same work, no connection between the QA record and the daily narrative.

ITAAC closure documentation assembled years after construction

Inspections, Tests, Analyses, and Acceptance Criteria must be closed before fuel loading. ITAAC closure packages require specific construction documentation that was supposed to be captured during construction but wasn\'t detailed enough in daily reports.

Concrete placement records don\'t meet ASME NQA-1 traceability requirements

Safety-related concrete requires NQA-1 level documentation — aggregate source certification, mix design qualification, placement temperature monitoring, and curing condition records. Standard daily reports capture cubic yards placed, not nuclear-grade traceability.

Welding on safety-related components requires ASME Section III documentation

Nuclear safety-related welds require ASME Section III compliance — qualified WPS, welder performance qualifications, NDE per Section V, and acceptance per Section III. Paper weld logs rarely achieve the documentation density NRC inspectors expect.

The POD Template Solution

1

Appendix B quality fields integrated with daily construction reports

POD\'s nuclear template merges QA and construction documentation — material receipt inspection, procedure compliance verification, and quality hold points are fields in the daily report, not a separate system. One report serves both construction management and QA.

Unified QA + construction
2

ITAAC evidence collection during construction

POD maps daily documentation fields to specific ITAAC items. As construction proceeds, the evidence needed for ITAAC closure accumulates automatically. When it\'s time to close an ITAAC, the documentation package is already assembled.

ITAAC-ready evidence
3

Nuclear-grade concrete placement documentation

Every concrete placement documented with NQA-1 traceability — aggregate certs, mix design, batch tickets, placement temperature, slump test results, cylinder assignments, and curing condition records linked to the specific structural element.

NQA-1 concrete records
4

ASME Section III weld documentation packages

POD builds complete weld packages per ASME Section III — WPS, PQR, welder quals, fit-up inspection, in-process NDE, final NDE, and PWHT records. Every weld on safety-related components fully documented during execution.

ASME III weld packages

Template Highlights

ITAAC Closure Dashboard

Every ITAAC item mapped to construction activities with evidence collection status and closure readiness

Nuclear QA Tracker

10 CFR 50 Appendix B quality records integrated with daily construction reporting in one platform

Safety-Related Weld Registry

ASME Section III weld packages built during construction with NDE results and procedure compliance

“We spent \$23M per month during a 14-month delay caused by ITAAC closure documentation gaps. Every gap traced back to construction daily reports that didn\\\'t capture enough detail for NRC reviewers. POD\\\'s template would have prevented every single one.”

— Nuclear Construction Director, Utility Owner-Operator

Live Demo

Every KPI From a 5-Minute Voice Report

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Schedule vs Budget

Schedule & Budget Performance

SPI 0.00CPI 0.00
25%50%75%100%$0$755K$1.5M$2.3M$3.0MJanFebMarAprMayJun
Planned Progress
Actual Progress
Planned Spend
Actual Spend
SPI0.00
CPI0.00
Sched Var+0.0%
Cost Var+0.0%
Schedule 3.0% behind planbudget 1.8% under target
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Build ITAAC Closure Into Every Daily Report

See how POD\\\'s 342-field nuclear template captures the 183 NRC-required documentation fields from the first pour to fuel load.

Last updated: March 2026