Offshore Wind

Offshore Wind Needs BOEM-Compliant Reports
Not Spreadsheets

POD\\\'s offshore wind template covers vessel logs, marine coordination, and BOEM COP compliance in 340 fields.

0+
Fields Per Vessel Report
0
BOEM Documentation Fields
0
% Reports Missing Marine Data
0
Min Voice Report

The Documentation Gaps

BOEM Construction and Operations Plan requires documentation you\'re not capturing

BOEM\'s COP conditions include marine mammal monitoring, turbidity measurements, vessel transit corridors, and cable burial depth verification. Most daily reports cover none of these. When BOEM reviews your records, the gaps are obvious.

Vessel-to-vessel crew transfer documentation is inconsistent

Personnel transfer logs between jack-up vessels, CTVs, and SOVs must document weather conditions, transfer method, and personnel counts. Paper logs on different vessels use different formats and nobody reconciles them.

Marine mammal observation records not linked to construction activities

Protected Species Observers document sightings and shutdowns in separate logs. The daily construction report shows a 3-hour delay with no explanation because the PSO log lives on a different vessel.

Cable lay and burial verification data lost between vessels

Cable lay vessel ROV surveys, burial depth measurements, and route deviation records exist in the vessel\'s DPR system. The project daily report onshore never sees this data until weeks later.

The POD Template Solution

1

BOEM compliance fields embedded in daily template

POD\'s offshore wind template includes every BOEM COP documentation requirement — marine mammal monitoring, turbidity readings, vessel AIS data, and noise mitigation measures. Compliance is built into the report, not bolted on after.

BOEM-ready reports
2

Multi-vessel daily reporting consolidated in one platform

Every vessel submits its daily data into POD — jack-up, CTV, SOV, cable lay, and survey vessels all reporting into one project-level daily report with vessel-specific sections.

Fleet-wide visibility
3

PSO observations linked to construction shutdowns

When a Protected Species Observer logs a marine mammal sighting, POD links it to the construction activity that was paused, the duration of the shutdown, and the restart verification. Your daily report tells the complete story.

Shutdown traceability
4

Cable burial verification integrated with as-built records

ROV survey data, burial depth measurements, and route deviations captured at the cable lay vessel and mapped to the project GIS. Daily reports include cable progress with burial compliance metrics.

Burial depth compliance

Template Highlights

Multi-Vessel Dashboard

Real-time status of every vessel on the wind farm with crew counts, weather windows, and operational status

BOEM Compliance Tracker

Every COP condition tracked with documentation status, submission deadlines, and regulatory correspondence

Marine Coordination Log

Vessel movements, crew transfers, PSO observations, and weather holds consolidated in one timeline

“BOEM asked for 6 months of marine mammal monitoring records correlated with pile driving activity. It took us 3 weeks to compile from paper PSO logs and vessel DPRs. With POD it would have been one click.”

— Environmental Compliance Lead, Offshore Wind Developer

Live Demo

Every KPI From a 5-Minute Voice Report

POD tracks hundreds of KPIs from a 5-minute voice report. Here are just 2 of them.

Schedule vs Budget

Schedule & Budget Performance

SPI 0.00CPI 0.00
25%50%75%100%$0$755K$1.5M$2.3M$3.0MJanFebMarAprMayJun
Planned Progress
Actual Progress
Planned Spend
Actual Spend
SPI0.00
CPI0.00
Sched Var+0.0%
Cost Var+0.0%
Schedule 3.0% behind planbudget 1.8% under target
PODMomentum Score

Momentum Score

POD
0
Accelerating — Velocity: 0.0
Dimensions
Schedule+0.0
Budget+0.0
Quality0.0
Safety+0.0
Momentum0
Velocity0.0
Accel+0.0
Project accelerating — momentum 78, velocity increasing by 3.0/period

These update in real time from a 5-minute voice report. No spreadsheets. No data entry.

Frequently Asked Questions

Make Every Vessel Report BOEM-Ready

See how POD consolidates multi-vessel reporting into one BOEM-compliant daily record with 340 tracked fields.

Last updated: March 2026