Every Data Hall.
One live Dashboard.
Amazon just announced a $15 billion data center campus. Google is building in 5 states simultaneously. These projects have 4,000 workers, thousands of commissioning test points, and a client needing Tier III/IV certification before a single server goes in.
The Hyperscale Documentation Problem
Hyperscale data centers demand commissioning-grade documentation that no weekly PDF can deliver.
Thousands of commissioning test points with no central system
Each data hall has IST, generator load bank, UPS transfer, CRAH performance, fire suppression, and arc flash tests. That is thousands of individual test results tracked in scattered spreadsheets, emails, and contractor submittals that nobody can cross-reference.
$500M in MEP equipment with zero asset-level ROI visibility
Generators, UPS systems, PDUs, chillers, CRAHs, switchgear — hundreds of millions in equipment. You know what you paid. You do not know which assets are installed, tested, commissioned, or delivering value. Your weekly PDF says "MEP progressing."
Tier III/IV certification requires documentation your GC is not producing
The Uptime Institute wants documented evidence of concurrent maintainability and fault tolerance testing. Maintenance-mode tests, redundancy verification, failover sequences — all need structured, timestamped records. Your GC is writing prose narratives.
4,000+ workers across 6 data halls with fragmented daily reporting
Each data hall has its own superintendent, its own subcontractors, its own schedule. Safety, progress, and quality data lives in silos. The owner gets a consolidated weekly PDF that is 5 days old and says "work continues as planned."
POD for Hyperscale Data Centers
From rack installation to Tier certification, POD captures every test result, every asset, every kW — daily from the field.
Structured Commissioning Capture
Every commissioning test is captured through guided voice prompts: test type, equipment ID, parameters measured, pass/fail result, and corrective action if needed. Results are structured, timestamped, and linked to the specific asset. Failed tests auto-generate punch items.
MEP Asset Tracking & ROI
Every major MEP asset has a profile tracking procurement, delivery, installation, commissioning, and operational handover. Cost, test results, and performance data flow to Equipment ROI KPIs. Know which assets deliver value and which are still sitting in the yard.
Tier Certification Documentation
POD captures maintenance-mode test results, redundancy verification, and failover test documentation as structured data. The certification body receives a complete, auditable trail — not a reconstructed narrative written weeks after the tests occurred.
Multi-Hall Unified Dashboard
All 6 data halls report into a single campus dashboard. Safety, progress, commissioning, and equipment status for each hall plus campus-wide roll-ups. Drill into any hall, any system, any test result from the portfolio view.
Cooling & Power Density Tracking
Track cooling system performance and power density per row, per rack, per data hall. Liquid cooling loop commissioning, chilled water flow rates, and kW/rack data captured from field technicians and integrated with design specifications.
Watch the Data Hall Come Online
Racks install left to right. Cable trays and cooling loops connect above and below. Power density labels appear as each rack commissions. The commissioning ring fills in real time.
Data Center Commissioning — Every Test Result Captured, Every Asset Tracked
A preview of the POD KPIs built for data center work.
Test Results
Equipment ROI
PODCost vs revenue
Returns
Purpose-Built for Hyperscale
Cable Tray & Pathway Tracking
Track cable tray installation progress by section, pathway type, and data hall. Fire-stop penetration seals, cable labeling compliance, and pathway capacity all documented from daily field reports.
Generator Load Bank Testing
Capture generator load bank test sequences: 25%, 50%, 75%, 100% load steps with fuel consumption, exhaust temperature, and voltage stability readings. Test results feed into generator commissioning acceptance criteria.
UPS Transfer Test Documentation
Document UPS static and maintenance bypass transfer tests with measured transfer times, load acceptance, and battery runtime verification. Critical for Tier III/IV concurrent maintainability certification.
Electrical Switchgear Commissioning
Track medium-voltage switchgear commissioning: protective relay testing, breaker timing, contact resistance, and insulation resistance results. Each test linked to one-line diagram equipment IDs.
The POD Difference
POD replaces the weekly PDF with a live project picture. Field reports flow into dashboards every day, so a campus of active data halls never goes a week between updates.
Frequently Asked Questions
Build the Data Hall. Document Every Test. Ship on Time.
4,000 workers, 6 data halls, thousands of commissioning test points — all captured from daily field voice reports. Tier certification documentation included.