A standalone battery build is a race to the grid tie — enclosures, PCS, thermal, fire, and a commissioning sequence that ends at COD. POD puts every test and energization step on the record, built from a voice note in the yard.

Commissioning test
passed, not assumed
Energization date
the number a merchant owner reads
Voice → report
from the yard, no forms

A merchant owner doesn't buy a battery. They buy an energization date.

Standalone grid storage lives or dies on the interconnection and the commissioning sequence that clears it for first charge. A generic construction report shows a percentage and hides the two things that decide COD — whether the commissioning tests are passing the first time, and whether the schedule is still holding the energization date. A battery build has to report the enclosures, the PCS, the thermal and fire scope, and every test, the day it happens.

What a battery day has to carry

Enclosures & DC blocks

Containers set on their pads, racks landed, modules installed, and the DC blocks wired. A battery site is a yard of identical enclosures — the report has to say which are built, which are wired, and which are live.

PCS & MV interconnection

Power conversion skids, medium-voltage collection, the transformer, and the utility tie. The interconnection is the milestone the whole schedule bends toward — and the one the utility controls.

Thermal & fire suppression

Enclosure HVAC, temperature-sensor commissioning, and the fire-suppression system. Thermal is a battery site’s defining scope — logged daily, it is your paper trail if a site is ever inspected.

Commissioning & energization

DC and AC tests, protection settings, the utility witness test, and first charge. Energization is a test sequence, not a checkbox — POD tracks each result against the COD date.

A yard, energized enclosure by enclosure

The commissioning wave crosses the yard, each column of enclosures flips from built to live, the collection bus carries to the substation, and the grid tie lights at COD — with the fire lanes and thermal sensors on the plan the whole time.

Commissioning → energizationCODFIRE LANESubstationGridStandalone grid storage · enclosures energizing column by column · thermal + fire monitoredBird's-eye yard · fire lanes between rows · MV collection bus to the interconnection

What the battery build looks like on the dashboard

Two numbers a storage EPC reads first: are the commissioning tests passing the first time, and is the schedule still holding the energization date.

Commissioning — passing first time?

First Pass Rate

POD
0.0%Overall Rate
target 90%
MV / Interconnect0%
PCS0%
Thermal / HVAC0%
DC Blocks0%
Fire Suppression0%
0
Passed
0
Failed
0
Total
-6.0%below target
Best: Fire Suppression at 90%
Needs attention: MV / Interconnect at 79%
Schedule — holding the COD date?

Earned Schedule

POD
0.00SPI(t)
0.0days SV(t)target 0.95
0
ES (days)
0
AT (days)
0
PD (days)
SPI(t) Trend
0.00
0.00
0.00
0.00
0.00
Wk 1Wk 2Wk 3Wk 4Wk 5
Target 0.95
Progress0% elapsed
Day 0Day 220

The battery build POD tracks

From the first pad to first charge — every phase reported the day it moves.

Civil & foundations

Grading, pads, cable trenches, and the fire lanes between enclosure rows. The site layout that decides how fast the yard can be built out.

Enclosure & DC install

Containers set, racks and modules landed, DC blocks wired. The bulk of the build — dozens of identical enclosures, each on the record.

PCS & MV interconnection

Power conversion, medium-voltage collection, transformer, and the utility tie. The scope the energization date depends on.

Commissioning & energize

Thermal, fire, protection, and the witness test — then first charge and COD. Each enclosure flips from built to energized.

Built for the battery build, not a generic form

What gets trackedGeneric templatePOD storage platform
Progress %Plus enclosures set + DC blocks wired + energized
EquipmentPCS skids, transformer, MV gear — install vs tested
Test logCommissioning first-pass rate by discipline
Thermal & fire suppressionHVAC, temp-sensor, and suppression tests, daily
Energization / COD scheduleEarned-schedule index against the COD date
Interconnection milestoneUtility witness test and grid tie, on the record

Free grid storage template & KPI tools

Grab the free grid-scale BESS daily-report template, or use POD's free KPI calculators — Google Sheets, Excel, or PDF. No account needed.

Keep them one click away — press Ctrl/⌘ + D to bookmark POD's free tools.

Grid storage construction questions

Yes. A standalone battery build is measured in commissioning tests passed and days to energization, not just install percentage. POD captures each commissioning result the day it happens, tracks first-pass rate by discipline, and runs the schedule against the energization and COD date — the number a merchant storage owner actually reads.

Put every commissioning test on the record

Speak the day from the yard. POD builds the report, logs the tests and the thermal and fire scope, and runs the schedule against the energization date before the crew rolls out.