Co-located solar-plus-storage is two builds in one — and the battery scope is where the schedule slips. POD reports PV and BESS on one energization timeline, built from a voice note in the field.

Energization date
the milestone both scopes serve
Two scopes
one interconnection, one report
Voice → report
from the field, no forms

Two builds, one interconnection, one date that matters

The PV array runs on its own crews and cadence. The battery scope — PCS, enclosures, SOC, thermal, fire-suppression — runs on another, and it is almost always the one that sets the energization date. A generic report treats it as one job and hides the slip. Solar-plus-storage has to report both scopes against the one milestone they share, the day each moves.

What a solar-plus-storage day has to carry

PV array & MWdc

The solar half — piles, tables, modules set, and direct-current capacity brought online. One of the two scopes sharing the interconnection.

PCS & inverters

Power-conversion skids set and terminated, inverters commissioned. The gear that moves energy both ways between the array, the battery, and the grid.

Enclosures & SOC

Battery enclosures set and racked, modules landed, state-of-charge brought up per enclosure. The scope that most often sets the energization date.

Thermal & fire safety

HVAC and fire-suppression commissioned, thermal set-points verified. Thermal runaway is storage’s defining hazard — the daily record is the paper trail.

The plant, one line at a time

Array to PCS to battery enclosures to the grid — energy flows along the bus, the PCS moves it both ways, and each enclosure’s state-of-charge rises as it commissions.

PV Array~PCS86%72%58%34%Battery enclosures — SOCTransformerGridTwo builds, one interconnection · PV energizing · 3 of 4 enclosures commissioned

What solar-plus-storage looks like on the dashboard

Two numbers a solar-plus-storage EPC reads first: where energization lands, and what is driving the slip.

The forecast — where does energization land?

Completion Forecast

POD
+18d

Completion distribution

BaselineSep 30, 2026P50Oct 18, 2026P80Nov 5, 2026P95Nov 24, 2026

Confidence

0%conf

Variance & cost

+0d
Variance
$0
Base Cost
$0
P50 Cost
P50 forecast: Oct 18, 2026 (18d late) — 68% confidence, cost impact +5.2%
The cause — what equipment is at risk?

Predictive Maintenance

POD

Fleet health

0204060801000HEALTH SCORE

At-risk assets

RT Crane (enclosures)
90h0
Telehandler (modules)
300h0
Reach Forklift (racks)
25h0

Impact

0
Health Score
0
Active Alerts
2
At-Risk Assets
2 assets need urgent attention — 2 alerts require action

The solar-plus-storage build POD tracks

Both scopes, phase by phase, against the one energization milestone.

Civil & PV array

Foundations, piles, racking, and modules — the solar scope built to mechanical completion while the pads for storage go in alongside.

PCS & collection

Power-conversion skids, inverters, and the medium-voltage collection that ties both scopes to the transformer and the grid.

Battery enclosures

Enclosures set, racks and modules landed, DC terminated, HVAC and fire-suppression in. The scope that drives the energization forecast.

Commissioning & energize

String tests, PCS energization, SOC brought up, utility witness, and the shared energization milestone the whole project is measured against.

Built for two scopes, not a generic form

What gets trackedGeneric templatePOD solar-plus-storage
Progress %Split by scope — PV MWdc + enclosures commissioned
Weather noteSun-hours + heat/thermal holds on battery work
EquipmentCranes, telehandlers, lifts — readiness vs at-risk
Battery-scope dataPCS, enclosures, SOC, thermal, fire-suppression
Energization forecastP50 / P80 / P95 dates toward one milestone
What is driving the slipAt-risk equipment tied to the battery scope

Free solar-plus-storage template & KPI tools

Grab the free combined solar-plus-storage daily-report template, or use POD's free KPI calculators — Google Sheets, Excel, or PDF. No account needed.

Keep them one click away — press Ctrl/⌘ + D to bookmark POD's free tools.

Solar-plus-storage construction questions

Yes. Solar-plus-storage is two builds sharing one interconnection, so POD tracks each scope — array install and MWdc, alongside PCS, enclosures, thermal, and energization — then rolls both into one completion forecast toward the shared energization milestone.

Free brochure

Take the Utility-Scale Solar field brief to your team

The solar day, from pile to MWdc online, for foreman to C-suite. Print it or share the link, no sign-up needed.