Onshore WindConstructionon the Record
A wind build is a logistics build — components, cranes, roads, and weather holds. POD puts every crane pick and lift window on the record, built from a voice note in the field.
Turbines-erected is one line. The build is four.
An owner reads the erection burn-up chart, but the day underneath it is components, cranes, roads, and weather holds — and any one of them can stop the picks. A generic report shows the count and hides the crane-pick story and the lift window that framed it. A wind build has to report all four, the day each moves.
What a wind day has to carry
Components & laydown
Tower sections, nacelles, and blades delivered, offloaded, and staged. A blade on the ground in the wrong sequence stalls the whole pick plan.
Crane picks
Every lift the main and tailing cranes make — base, mid, top, nacelle, and each blade. Turbine erection is a crane-pick story, captured pick by pick.
Roads & logistics
Access roads, crane pads, and the transport that moves 70-metre blades across a spread. The logistics that decide whether the crane can even set up.
Weather holds & lift windows
Wind speed decides the day. When the lift window opened, when it closed, and how fast the crew recovered the lost time.
A turbine, pick by pick
The crane stacks the tower sections, lifts the nacelle onto the top, and hangs the blades — the rotor turns into a star and spins, while the turbines behind it are already producing.
What the wind build looks like on the dashboard
Two numbers a wind EPC reads first: is the schedule recovering from the holds, and is the crane fleet ready to pick.
Weather Recovery
PM Compliance
The wind build POD tracks
From the first crane pad to first rotation — every phase reported the day it moves.
Roads & foundations
Access roads, crane pads, and turbine foundations poured and cured. The civil scope that has to be right before a single component arrives.
Delivery & laydown
Towers, nacelles, and blades delivered and staged in pick sequence. Component logistics is the quiet driver of the erection schedule.
Erection
Crane picks — tower sections stacked, nacelle set, blades hung and the rotor turned up. The most weather-sensitive scope on the site.
Commissioning & energize
Mechanical completion, electrical terminations, grid tie, and first rotation. Each turbine flips from erected to producing.
Built for the wind build, not a generic form
| What gets tracked | Generic template | POD wind platform |
|---|---|---|
| Progress % | Plus turbines erected + crane picks completed | |
| Weather note | Wind-speed lift window + days lost and recovered | |
| Equipment | Main + tailing cranes — maintenance current vs overdue | |
| Crane-pick detail | Base / mid / top / nacelle / blades, per turbine | |
| Component logistics | Delivery, laydown, and pick sequence | |
| Weather-hold recovery rate | Days lost vs days recovered against target |
Free onshore wind template & KPI tools
Grab the free onshore wind daily-report template, or use POD's free KPI calculators — Google Sheets, Excel, or PDF. No account needed.
Onshore wind construction questions
Yes. Turbines-erected is the burn-up chart an owner reads, but the day is a crane-pick story — tower sections, nacelle, blades, and the wind-speed window each lift needed. POD captures the picks and the holds from a field voice note, then rolls them into the erection curve.
Put every crane pick on the record
Speak the day from the pad. POD builds the report, logs the picks and the lift window, and updates the erection curve before the crew rolls out.