Utility-scale solar is measured in MWdc energized, not modules counted. POD gives the solar EPC a PV-specific daily report and dashboard — piles, tables, DC, inverters, and MWdc online — built from a voice note in the field.

MWdc energized
the number the owner reads first
Block by block
not one lumped module count
Voice → report
from the field, no forms

"200 modules installed" is not a solar report

Your owner gets a line that says modules were installed — no rows completed per crew, no DC circuits landed, no inverters energized, no MWdc brought online. A generic construction template captures the count and misses the plant. Solar has to report the build the way it gets paid: by capacity online, block by block, the day it happens.

What a solar day has to carry

Irradiance & weather

The sun-hours the day actually delivered, and the wind or heat holds that stopped module lifts. Every production number reads against the resource.

Piles, racking & modules

Piles driven and refusals, tables built, modules set, torque-tube alignment. The physical build, block by block, not one lumped “modules installed” line.

DC & inverters

DC circuits pulled and landed, combiners energized, inverters and skids commissioned. The electrical scope that turns panels into power.

MWdc energized

The number the owner and the offtaker read first — direct-current capacity brought online, block by block, toward mechanical completion.

The whole array, from above

Panel rows set block by block, the sun sweeps the field, combiner boxes gather each block, and a medium-voltage line runs to the substation — a live map of a solar build.

SubstationGrid9 of 12 rows set · 3 of 4 blocks combined · 66 MWdc energized

What the solar build looks like on the dashboard

Two numbers a solar EPC reads first: is each scope installing on budget, and is the fleet working.

Cost — are installs on budget?

Cost Per Install Unit

POD
+0.0%overall variance
4 work types tracked
Module Setting+0.0%
Act
$0.00
Est
$0.00
0 module
Pile Driving+0.0%
Act
$0.00
Est
$0.00
0 pile
DC Wire Pull+0.0%
Act
$0.00
Est
$0.00
0 LF
Inverter Set+0.0%
Act
$0.00
Est
$0.00
0 each
Equipment — is the fleet working?

Equipment Performance

Below Target
02550751000%UTILIZATION
Utilization
0%
vs Target
-7.0pp
Target
85%
Utilization by Zone
Pile Drivers
6 units0%
Telehandlers
12 units0%
Tracker Crews
8 units0%
Bonding Rigs
4 units0%
Util: 78% of 85% target
Gap: -7.0pp across 4 zones

The solar build POD tracks

From first pile to first megawatt — every phase reported the day it moves.

Civil & piles

Grading, access roads, and pile driving. Refusals and predrills are logged the day they happen — they drive the racking schedule.

Racking & modules

Tables assembled, modules set and clamped. Rows completed per crew per day is the productivity number that forecasts the finish.

DC & electrical

DC wire pulled, combiners and inverters set, MV collection run. The scope that connects the array to the substation.

Commissioning

String tests, inverter energization, and MWdc brought online. The punch that converts a built array into a producing plant.

Built for the solar build, not a generic form

What gets trackedGeneric templatePOD solar platform
Progress %Plus rows set, blocks combined, MWdc energized
Weather noteSun-hours delivered + wind/heat holds on lifts
EquipmentPile drivers, telehandlers, tracker crews — worked vs waiting
Install productivityCost per install unit by scope (piles, modules, DC, inverters)
Electrical commissioningDC circuits, combiners, inverters energized
MWdc roll-up across blocksOne capacity number toward mechanical completion

Free Solar PV template & KPI tools

Grab the free Solar PV daily-report template, or use POD's free KPI calculators — Google Sheets, Excel, or PDF. No account needed.

Keep them one click away — press Ctrl/⌘ + D to bookmark POD's free tools.

Solar construction questions

Yes. The solar day structures into the fields a solar owner actually reads — piles set, tables and modules installed, DC circuits pulled, inverters energized, and MWdc brought online — all from a field voice note or a few photos. The report shows the build the way the owner measures it, not a generic “200 modules installed” line.

Put the solar day on the record

Speak it from the field. POD builds the report, tracks the MWdc, and updates the dashboard before the crew leaves the site.