Free Earned Value Report Template

Measure project performance with CPI, SPI, EAC, and ETC calculations using earned value management methodology for integrated cost-schedule analysis.

3
Tabs
6
Features
Yes
Print-Ready
Free
Cost

What's Included

This template includes 3 organized sections ready for your project.

1

EVM Dashboard

2

Period Details

3

S-Curve

Key Features

Everything you need to manage earned value report documentation professionally.

EVM Calculations

PV, EV, AC, CPI, SPI, CV, SV, EAC, ETC, VAC, and TCPI calculated automatically per period

S-Curve Visualization

Planned Value, Earned Value, and Actual Cost plotted on a time-scaled S-curve

Performance Indices

CPI and SPI trend tracking across reporting periods to identify performance trajectories

Estimate at Completion

Multiple EAC methods: mathematical (based on CPI), manager's estimate, and hybrid calculations

Variance Analysis

Cost variance and schedule variance breakdowns by WBS element to identify problem areas

Forecasting

To-Complete Performance Index showing required efficiency to finish on budget

Why This Template Is Different

Built by construction professionals who manage real projects.

POD vs. Generic Templates

Built for construction
Generic officePurpose-built
Auto-calculations
ManualAutomatic
Print formatting
BasicProfessional
Related document links
NoYes
AI integration
NoPlan of Day
Cost
FreeFree

Financial-Specific Design

Designed for construction project management workflows
3 organized sections covering all critical data
Print-optimized with professional formatting and page breaks
Auto-calculations reduce manual errors and save time

Templates Are Just the Beginning

Plan of Day's AI platform turns this template into a living, intelligent document.

Before

Static template

Manual data entry into spreadsheet cells
No trend tracking or historical comparison
Static document with no intelligence
Copy-paste to distribute to stakeholders
No alerts when items are overdue or at risk

After

AI-powered Plan of Day

AI auto-populates fields from voice reports and uploads
Hundreds of KPIs calculated from your data automatically
AI agents flag overdue items, risks, and anomalies
Instant distribution to your entire team
Trend analysis and predictive insights across all projects

Frequently Asked Questions

Earned Value Management (EVM) is a methodology that integrates scope, schedule, and cost data to provide an objective measurement of project performance. By comparing planned work, completed work, and actual costs, EVM reveals whether a project is on budget and on schedule — and forecasts where it will finish.

CPI (Cost Performance Index) measures cost efficiency — a CPI of 0.90 means you're getting 90 cents of value for every dollar spent. SPI (Schedule Performance Index) measures schedule efficiency — an SPI of 0.85 means you're progressing at 85% of the planned rate. Both below 1.0 indicate problems.

The most common method is EAC = BAC / CPI, which assumes future cost performance will match past performance. The template also supports the manager's estimate method (manual bottom-up re-estimate) and the hybrid method incorporating both CPI and SPI for a more nuanced forecast.

Get Your Free Earned Value Report Template

Quick signup. Instant download. Ready to use on your next project.