Civil & Heavy Construction

Move Earth.
Not Paper.

Earthwork quantities, equipment hours, weather delays, and DOT compliance—captured in 60 seconds from the cab of a dozer.

0.0M
CY Earth Moved
0
Lane Miles
0K
Equipment Hours
0
Inspections Passed
"When the DOT auditor showed up, I pulled the timeline and showed them every inspection in 90 seconds. He'd never seen anything like it."

— Project Manager, Highway Contractor

Civil Construction Challenges

The problems every heavy contractor knows

Equipment hours are money—tracking is everything

Dozers, scrapers, and trucks running without proper tracking burns budget fast. You need hour-by-hour visibility.

DOT inspections require audit-ready documentation

Inspectors show up unannounced. If you can't produce the paperwork in 5 minutes, you're in trouble.

Weather delays need immediate documentation for claims

Rain delays cost money. If you can't prove the impact with timestamped documentation, you won't recover it.

Crews spread across miles of linear projects

A 20-mile highway project means crews working at 15 different locations. Unified visibility is impossible.

How POD Solves Them

Built for civil and heavy construction

Equipment Cost Tracking

Track hours by equipment type and contractor. See which machines are earning and which are burning.

Real-time equipment ROI

Inspection-Ready Documentation

Photos, notes, and sign-offs organized by station and date. Pull any inspection in seconds.

Audit-ready always

Weather-to-Delay Correlation

Automatic weather logging with timeline correlation. Claims documentation writes itself.

Automated claim support

GPS-Tagged Linear Reporting

Reports tagged to station numbers automatically. Know exactly where every activity happened.

Station-based tracking

Civil-Specific Features

Quantity Tracking

CY excavation, tons of asphalt, LF of pipe—all tracked with pay item correlation.

Fleet Integration

Import equipment hours from fleet management. Automatic cost allocation.

DOT Compliance

Pre-formatted exports for state DOT reporting requirements.

Ready to Modernize Civil Reporting?

See how POD handles linear projects and DOT documentation.