Back online
Schedule Risk Alert

Your Float Was Consumed 2 Weeks Ago.
Nobody Told You.

Your PM approved a 3-day delay on steel erection because “we have float.” Except the float was consumed two weeks ago by a concrete pour delay nobody tracked. Now the entire project just slipped 3 weeks. Nobody saw it coming.

0%
PMs Can't ID Zero-Float
0wk
Avg Delay from Lost Float
$0K
Avg Cost of CP Failure
0%
Schedule Claims from Float

Critical Path Cascade — Watch the Float Disappear

One 3-day delay triggers a chain reaction through the entire network

FoundationsCRITICALConcrete Pour8dSteel Erection5dFraming3dMech Rough-In1dElec Rough-In2dCommissioningCRITICALSubstantialCRITICAL3-Day DelayApproved by PM
Critical / Zero Float
Float Remaining
Non-Critical Activity

The Challenge

Why 73% of project managers cannot identify their zero-float activities

01

Float consumption is invisible

Your schedule shows 8 days of float on steel erection. What it does not show is that concrete pour delays last month quietly consumed 6 of those days. Your PM sees float that no longer exists.

02

One delay cascades everywhere

A 3-day delay on one activity does not cost you 3 days. It triggers resource conflicts on 4 downstream trades, pushes mechanical rough-in into the holidays, and blows your commissioning window by 3 weeks.

03

Resource conflicts on the critical path

When two critical-path activities need the same crane on the same day, one of them slips. Nobody sees this conflict until the morning of, when the crane operator asks which foreman has priority.

04

Monthly schedule updates are autopsy reports

You update your CPM schedule once a month. By the time you see the critical path has shifted, 3 weeks of float have been consumed and the project end date has already moved. You are reading history, not managing the future.

The POD Advantage

How POD eliminates critical path blindness

Real-Time Float Monitoring

Daily float alerts

POD calculates remaining float for every activity daily based on actual field progress. When float drops below your threshold, you get an alert the same day — not at next month's schedule update.

Cascade Impact Preview

Pre-approval impact view

Before you approve any delay, POD shows you exactly which downstream activities are affected, how much float each one loses, and whether the project end date shifts. See the full cascade before it happens.

Resource Conflict Detection

72-hour early warning

POD maps crew and equipment assignments against the critical path. When two zero-float activities need the same resource, you get flagged 72 hours in advance — enough time to mobilize alternatives.

Critical Path Drift Tracking

Live CP tracking

The critical path is not static. POD tracks when activities shift onto or off the critical path as progress changes. You always know which activities have zero margin right now, not which ones had zero margin last month.

Critical Path Management Features

Live CP Monitor

Real-time critical path tracking from daily field progress. Know which activities have zero margin today.

Cascade Preview

See the full downstream impact of any proposed delay before you approve it.

Float Alerts

Automated warnings when float drops below threshold on any schedule activity.

“Our PM approved a 3-day delay on mechanical rough-in without checking float. We discovered 2 weeks later that the critical path had shifted and our substantial completion date moved 19 days. That delay cost us $420K in liquidated damages. We never saw it coming.”

— VP of Operations, Commercial General Contractor

Critical Path Visibility — Know Your Zero-Float Activities

These KPIs auto-populate from your daily uploads — no manual data entry required.

Critical Path Exposure

POD
$0
Steel ErecF:0dMech RoughF:0dElec RoughF:3dFireproofiF:1dCommissionF:0dConcrete PF:2d
Exposure$0
CP Items0
Zero Float3
Steel Erection carries the highest exposure — $265K at risk with 0 days float

Float Analysis

Caution
0dAvg Float
Critical (0d)
0
Near-Critical (1-5d)
0
Positive Float (>5d)
0
Longest Path0 days
Distribution
0
0 days
0
1-5 days
0
6-10 days
0
11-20 days
0
20+ days

Frequently Asked Questions

Do You Know Which Activities Have Zero Float Right Now?

If the answer takes more than 10 seconds, your critical path is already at risk.

Last updated: March 2026