High-Rise & Vertical Construction

Floor by floor.Day by day.

Concrete is topping out on 40. Curtain wall is climbing 30. MEP rough-in is on 20. Finishes are on 10. One tower crane feeds all of it — and the only place that whole vertical picture exists is in four superintendents’ heads.

0
Floors in the Air
0
Trades Stacked at Once
0
Min: Field Report to Dashboard

The Vertical Coordination Problem

A tower runs every trade at once on one shared crane. The status that matters is vertical, and no weekly PDF can hold it.

01

Multi-floor coordination is exponentially complex

Concrete on floor 40, curtain wall on 30, MEP rough-in on 20, finishes on 10 — all running at once on shared vertical logistics. No single person can hold the whole tower in their head, and the weekly roll-up is already stale.

02

The tower crane drives the critical path

One or two cranes feed every trade. Every pick is contested, and a scheduling conflict on the crane cascades delays up and down the building. Crane time is the scarcest resource on the job and the hardest to see.

03

Wind delays are unpredictable and hard to prove

High wind stops crane operations, curtain-wall installation, and any exterior work. Documenting each shutdown — when, how long, what it stopped — with enough precision to support a schedule claim is its own full-time job.

04

Vertical logistics bottleneck every trade

Hoists, cranes, and elevators are shared. Getting the right material to the right floor at the right time takes constant coordination, and a missed hoist window idles a crew twenty floors up.

POD for High-Rise

From the pour cycle to the crane log to work at height, POD captures the vertical job every day from the field.

The Whole Tower in One Daily

Vertical visibility

Your supers already report floor by floor — concrete on 40, curtain wall on 30, MEP on 20. POD captures each of those dailies by voice and structures them into one same-day record the whole team reads, instead of four separate sets of notes.

Crane Downtime Log

Crane visibility

Log crane picks and downtime from the field as they happen. The day’s crane activity and lost time land in the structured daily, so a contested-crane pattern is visible in the record instead of living in the super’s memory.

Wind-Delay Documentation

Claim-ready logs

Capture high-wind shutdowns and crane downtime with timestamps and the activities they stopped, straight from the field. A delay claim then rests on a dated, auditable log instead of a reconstructed narrative.

Work-at-Height Risk

Risk surfaced early

Track proximity and at-height risk from daily observations — crane swing radius, edge exposure, hoist areas — and surface where risk is climbing, so the crew acts before an incident instead of documenting one after.

Vertical Logistics Notes

Material flow

Crews note hoist, delivery, and material constraints in the daily voice report — what is staged, what is waiting, what blocked a floor. POD structures those notes into the record so the logistics friction is written down, not just felt.

Watch the Tower Rise

Floors stack from the ground up. The tower crane climbs with the top floor. Each level flips from in-progress to topped-out, and the floors-complete count keeps pace with the cycle.

High-rise tower rising floor by floor
In progressTopped out
0
Floors topped out
0
Current working floor
10
Floors in the tower

The two numbers a high-rise lives on: cycle pace and risk at height

These KPIs auto-populate from daily field uploads — no manual data entry required.

Earned Schedule

POD
0.00SPI(t)
0.0days SV(t)target 0.95
0
ES (days)
0
AT (days)
0
PD (days)
SPI(t) Trend
0.00
0.00
0.00
0.00
0.00
Fl 10Fl 20Fl 30Fl 35Fl 40
Target 0.95
Progress0% elapsed
Day 0Day 160
Proximity Risk Score
POD
target <30

Proximity risk

02550751000RISK INDEX

Risk zones

Crane Swing Radius
HIGH0
Shared airspace
Leading Edge / Floor Openings
MED0
Open perimeter
Hoist & Material Landing
MED0
Load staging
Formwork & Reshore
LOW0
Controlled access

Risk trend

MonTueWedThuFri

Purpose-Built for Going Vertical

Floor-Cycle Notes

Capture which level is on formwork, rebar, pour, strip, or reshore from the daily voice report, so the floor cycle is written into the record day to day instead of tracked on a whiteboard in the trailer.

Hoist & Elevator Log

Log hoist and construction-elevator availability and the constraints crews hit, captured from the field, so vertical-transport friction shows up in the daily instead of only in a crew standing idle.

Wind-Speed & Downtime Log

Record wind events and the hours they halted crane or exterior work, with the impacted activities, as a timestamped field log for schedule documentation.

At-Height Observation Capture

Capture safety observations tied to floor and zone — tie-off, guardrail, and leading-edge exposure — so proximity risk is tracked where the fall hazard actually is.

The POD Difference

POD turns a dozen floors of scattered daily reports into one live picture of the tower. The vertical status that used to live in four supers’ heads is in one place, updated every day from the field.

Frequently Asked Questions

Run the Tower from One Live Picture.

Floor-by-floor status, crane picks, wind delays, and work-at-height risk — all from a daily field voice report.