Build Wind Farms.
Not Spreadsheets.
Track turbine erection, blade installation, weather delays, and safety incidents across multiple remote sites—even without cell service.
"37 turbines erected, 142 MW capacity, zero LTIs, $2.1M under budget—and we never once opened Primavera on-site."
— Project Manager, Texas Wind Farm
Wind Farm Reporting Challenges
The problems every wind developer knows
Sites spread across counties with no connectivity
Wind farms are remote by nature. Cell service is unreliable at best, nonexistent at worst.
Weather is the biggest schedule variable
Wind speed, lightning, and temperature windows dictate every crane lift and blade installation.
Crane logs, turbine status, and safety need unified tracking
Multiple contractors, equipment, and safety requirements across dozens of turbine locations.
Owners want daily visibility without site visits
Driving 3 hours to check on progress isn't practical. They need remote real-time access.
How POD Solves Them
Built for remote energy construction
Full Offline Mode
Capture voice reports, photos, and data without cell service. Auto-sync when you're back in range.
Weather-to-Schedule Correlation
See exactly how weather delays impact your timeline. Automatic documentation for claims.
Turbine-by-Turbine Progress
Track each turbine through foundation, erection, and commissioning phases.
Owner Dashboard Access
Read-only timeline access for owners and investors. No training required.
Wind-Specific Features
Crane Window Tracking
Log wind speed windows and crane availability. Know exactly when you can lift.
Commissioning Checklists
Built-in commissioning workflows for each turbine. Nothing gets missed.
10 Languages
International crews speak their native language. Reports translate automatically.
See It Live — POD Wind Report
Watch 80 turbines get built day by day. Click any turbine to see its exact construction stage.
Ready to Simplify Wind Farm Reporting?
See how POD handles remote sites with zero cell coverage.