Six Agencies. Fifty Chargers.
One dashboard.
You won a contract to build 50 EV charging stations along a highway corridor. Each needs utility interconnection, AHJ electrical permit, NEVI certification, ADA approval, fire marshal sign-off, and environmental clearance. That's 300+ permits tracked on a Google Sheet updated 11 days ago.
The EV Corridor Challenge
Multi-site, multi-agency, multi-year projects with federal funding requirements that most contractors have never navigated.
Each station needs 6 permits from different agencies
Utility interconnection (12+ month lead time), AHJ electrical permit, NEVI federal certification, ADA accessibility review, fire marshal sign-off, and environmental clearance. That is 300 permits across 50 stations on a single spreadsheet updated by whoever remembers.
Utility interconnection is the critical path — and you cannot control it
The utility company dictates the interconnection timeline. If transformer delivery slips 3 months, your entire corridor schedule shifts. Without daily tracking, you will not know about the delay until the utility casually mentions it in a monthly call.
NEVI compliance requires documentation most GCs have never produced
The National Electric Vehicle Infrastructure program requires 150kW minimum, four CCS ports, 97% uptime, ADA-compliant payment systems, and specific signage. Missing one requirement means losing federal funding for that station.
Commissioning across 50 sites means 50 different punch lists at once
Each station has its own commissioning sequence: electrical inspection, load testing, network connectivity, payment terminal activation, signage verification, and ADA path review. Managing these across a corridor is logistically impossible with manual tracking.
POD for EV Infrastructure
From utility application to NEVI-compliant go-live, POD tracks every station across your entire corridor.
Multi-Agency Permit Dashboard
Every station shows its permit chain status across all 6 agencies in a single view. Color-coded by status: submitted, under review, approved, expired. Automatic alerts when a permit nears expiration or blocks construction start.
Utility Interconnection Tracker
Dedicated tracking for utility milestones: application submitted, system impact study, facilities study, interconnection agreement, transformer delivery, meter installation. Each milestone triggers the next phase of site construction.
NEVI Compliance Scoring
Every NEVI requirement is a tracked KPI per station: charger capacity, port count, uptime capability, payment compliance, ADA accessibility, signage. Compliance score auto-calculated from daily field data and commissioning results.
Corridor-Level Portfolio View
See all 50+ stations on a single dashboard with construction stage, crew deployment, permit status, and commissioning progress. Drill into any station for daily detail. Portfolio KPIs highlight bottleneck sites.
Commissioning Checklist Engine
Station-by-station commissioning tracking with electrical, network, payment, signage, and ADA checklists. Test results captured from the field via voice reports. Automatic punch list generation for failed items.
Watch the Corridor Come Online
Each station progresses through construction stages from foundation to live charging. Power lines connect to the utility grid as stations commission.
EV Infrastructure Metrics — Permits, Compliance, and Carbon Impact Tracked Daily
These KPIs auto-populate from daily field uploads — no manual data entry required.
Carbon Footprint Tracker
PODEmissions trend
Emission sources
Totals
Permit Cascade
PODExpiry timeline
Status split
Nearest expiry
Purpose-Built for EV Infrastructure
Carbon Impact Documentation
Track the carbon offset of each station as it comes online. Daily kWh delivered, vehicles charged, and estimated gasoline displacement — all auto-calculated for NEVI and ESG reporting.
Make-Ready Milestone Tracking
Track the critical "make-ready" infrastructure: trenching, conduit, transformer pad, electrical panels, and stubouts. Each site progresses through standard construction stages with daily updates.
Load Testing Documentation
Capture load test results directly from field technicians: power draw, charge curve, fault codes, and network connectivity. Results feed into commissioning acceptance criteria automatically.
Site Access and Easement Tracking
Track easement agreements, property access schedules, and construction windows per site. Many corridor locations have restricted hours, shared parking, or seasonal limitations that affect sequencing.
The POD Difference
POD keeps distributed multi-site programs visible in one place, with field reports and status from every location flowing into a single live dashboard instead of a shared spreadsheet.
Frequently Asked Questions
Build Your Corridor With Confidence
300+ permits, 50+ stations, 6 agencies per site — all tracked from daily field voice reports. NEVI compliance built in.