Onshore WindRepoweredon the Record
Old turbines come down, taller ones go up on the same foundation. POD puts both halves — the removals and the re-erection — on one daily report, built from a voice note in the field.
A repower day is half teardown, half build. A greenfield report only sees the build.
The old turbines come down before the new ones go up, on the same foundations and the same grid tie. A new-build template captures the erection and drops the rest — the removals, the salvage and recycling, the foundations reused or modified, and the capacity uplift that pays for the whole job. POD reports the teardown and the rebuild on one record, the day each moves.
What a repower day has to carry
Removals & teardown
Blades down, nacelle down, tower sections down. The dismantling of an energized-history turbine is the most hazardous day on the site — and the half a greenfield report never sees.
Salvage & recycling
Steel towers, gearboxes, and copper recycled; blades diverted where they can be. What was removed, where it went, and the tonnes kept out of landfill — on the record for the owner and the tax credit.
Reused foundation & interconnection
The pad and the grid tie stay — the whole reason to repower. Which foundations are reused as-is, which need modification for a taller machine, and where the interconnection stands.
Re-erection & re-energize
A taller turbine goes up on the same base — bigger crane picks, an outage window to hold, and first rotation. Capacity uplift is the number the whole job is measured by.
Old down, taller up, same pad
The Gen-1 turbine dismantles — blades down, tower down — and a taller machine rises on the same reused foundation, its rotor turning up as the last of the old one comes off.
What the repower looks like on the dashboard
Two numbers a repower manager reads first: is the teardown being diverted from landfill, and can the crew re-erect inside the outage window.
Waste Velocity
PODSchedule Recovery Capacity
PODThe repower POD tracks
From de-energizing the old fleet to first rotation of the new — every phase reported the day it moves.
Teardown & removals
Old turbines de-energized, blades and nacelles removed, towers sectioned down. The demolition half, logged pick by pick.
Foundation reuse & mods
Foundations inspected, reused as-is or modified for a taller, heavier machine. The reused base the schedule is built on.
Delivery & laydown
Bigger towers, nacelles, and longer blades delivered and staged in pick sequence — heavier components than the fleet they replace.
Re-erection & re-energize
Taller turbines erected on the reused pads, terminated, and re-energized. Each unit flips from removed to producing more MW.
Built for the repower, not a greenfield form
| What gets tracked | Greenfield template | POD repower platform |
|---|---|---|
| Progress % | Plus turbines removed + re-erected + re-energized | |
| Equipment | Cranes for teardown AND rebuild — worked vs waiting | |
| Weather note | Lift window for both the removal and the pick | |
| Removals & salvage | Components down, recycled, diverted from landfill | |
| Reused foundation | As-is vs modified for the taller machine | |
| Capacity uplift (MW before → after) | The number the repower is justified by |
Free templates & KPI tools
Browse POD's free construction daily-report templates, or use the free KPI calculators — Google Sheets, Excel, or PDF. No account needed. A dedicated wind repowering template is on the way.
Onshore wind repowering questions
Yes. A repower day is half teardown, half build. POD logs the components coming down — blades, nacelles, tower sections — and where they go: recycled, salvaged, or diverted from landfill. The removals and the re-erection sit on the same daily report, so the record shows both halves of the day.
Put the teardown and the rebuild on one record
Speak the day from the pad. POD logs the removals, the salvage, the reused foundations, and the re-erection, and keeps the capacity uplift in front of the owner.