Old turbines come down, taller ones go up on the same foundation. POD puts both halves — the removals and the re-erection — on one daily report, built from a voice note in the field.

Teardown
removals + salvage, logged
Rebuild
taller machine, more MW
Voice → report
from the pad, no forms

A repower day is half teardown, half build. A greenfield report only sees the build.

The old turbines come down before the new ones go up, on the same foundations and the same grid tie. A new-build template captures the erection and drops the rest — the removals, the salvage and recycling, the foundations reused or modified, and the capacity uplift that pays for the whole job. POD reports the teardown and the rebuild on one record, the day each moves.

What a repower day has to carry

Removals & teardown

Blades down, nacelle down, tower sections down. The dismantling of an energized-history turbine is the most hazardous day on the site — and the half a greenfield report never sees.

Salvage & recycling

Steel towers, gearboxes, and copper recycled; blades diverted where they can be. What was removed, where it went, and the tonnes kept out of landfill — on the record for the owner and the tax credit.

Reused foundation & interconnection

The pad and the grid tie stay — the whole reason to repower. Which foundations are reused as-is, which need modification for a taller machine, and where the interconnection stands.

Re-erection & re-energize

A taller turbine goes up on the same base — bigger crane picks, an outage window to hold, and first rotation. Capacity uplift is the number the whole job is measured by.

Old down, taller up, same pad

The Gen-1 turbine dismantles — blades down, tower down — and a taller machine rises on the same reused foundation, its rotor turning up as the last of the old one comes off.

Reused foundation — old comes down, a bigger turbine goes up on the same padGen 1 — removedRepowered — taller

What the repower looks like on the dashboard

Two numbers a repower manager reads first: is the teardown being diverted from landfill, and can the crew re-erect inside the outage window.

Teardown — diverted from landfill?

Waste Velocity

POD
012243648TargetWk 1Wk 2Wk 3Wk 4
By Type
Steel towerR
0%
Nacelle & gearboxR
0%
Copper & cableR
0%
Blades (GFRP)
0%
Foundation spoilR
0%
Current0
Target32
Recyclable0%
Waste Cost$0
Waste decelerating — 87% recyclable, $195K total cost
Re-erection — inside the outage window?

Schedule Recovery Capacity

POD
RECOVERY NEEDED0dRECOVERY CAPACITY0d
Labor7d
Equipment6d
Weather2d
Needed0d
Capacity0d
Gap0d
1-day shortfall — need additional resources or schedule re-baseline to close the gap

The repower POD tracks

From de-energizing the old fleet to first rotation of the new — every phase reported the day it moves.

Teardown & removals

Old turbines de-energized, blades and nacelles removed, towers sectioned down. The demolition half, logged pick by pick.

Foundation reuse & mods

Foundations inspected, reused as-is or modified for a taller, heavier machine. The reused base the schedule is built on.

Delivery & laydown

Bigger towers, nacelles, and longer blades delivered and staged in pick sequence — heavier components than the fleet they replace.

Re-erection & re-energize

Taller turbines erected on the reused pads, terminated, and re-energized. Each unit flips from removed to producing more MW.

Built for the repower, not a greenfield form

What gets trackedGreenfield templatePOD repower platform
Progress %Plus turbines removed + re-erected + re-energized
EquipmentCranes for teardown AND rebuild — worked vs waiting
Weather noteLift window for both the removal and the pick
Removals & salvageComponents down, recycled, diverted from landfill
Reused foundationAs-is vs modified for the taller machine
Capacity uplift (MW before → after)The number the repower is justified by

Free templates & KPI tools

Browse POD's free construction daily-report templates, or use the free KPI calculators — Google Sheets, Excel, or PDF. No account needed. A dedicated wind repowering template is on the way.

Keep them one click away — press Ctrl/⌘ + D to bookmark POD's free tools.

Onshore wind repowering questions

Yes. A repower day is half teardown, half build. POD logs the components coming down — blades, nacelles, tower sections — and where they go: recycled, salvaged, or diverted from landfill. The removals and the re-erection sit on the same daily report, so the record shows both halves of the day.

Put the teardown and the rebuild on one record

Speak the day from the pad. POD logs the removals, the salvage, the reused foundations, and the re-erection, and keeps the capacity uplift in front of the owner.