Repowering is a demolition and a bigger build on a site that's already permitted and already connected. POD reports both halves — what comes down and what goes up — from a voice note in the field.

Repowering is two projects on one pad, and a generic report only sees one

An asset ages out. The owner keeps the foundation and the interconnection and swaps the equipment for something bigger — an O&M-driven decision executed as a construction project. But a greenfield report only captures the rebuild. It misses the removals, the salvage and recycling, and the capacity uplift that justified the whole job. POD reports the teardown and the rebuild together, the day each moves.

The repower paths POD covers

Each technology repowers differently — but every one is a teardown and a rebuild on a reused site.

Onshore Wind Repower

Old turbines down, taller ones up on the same foundation. Removals, salvage, re-erection.

Live

Offshore Wind Repower

Demolition at sea plus a re-install — vessels and weather windows on both halves.

Rolling out

Solar PV Repower

Old modules out, high-output ones in — the emerging first-mover wave.

Emerging · rolling out

BESS Augmentation

Degraded racks replaced, capacity added — restoring an aging battery to nameplate.

Rolling out

Onshore Wind Repower is live now. Offshore Wind Repower, Solar PV Repower, and BESS Augmentation are rolling out.

Built for the teardown and the rebuild

Both halves, one report

A repower day is a demolition and a build at once. POD tracks the removals and the salvage alongside the re-erection — the teardown a greenfield template never captures.

Reused foundation & interconnection

The pad and the grid tie are already there — the whole reason to repower. POD reports against the reused base, not a blank site.

Capacity uplift, on the record

Repower is measured in MW gained and blades diverted from landfill. POD puts the before-and-after and the recycling on the daily report — the numbers an owner and the IRS both read.

One asset, its whole life

The same platform followed the site through construction and O&M. Repower is the next chapter on the same login, not a new tool.

The same site, renewed

An aging turbine comes down and a taller one takes its place on the same foundation and grid tie — the renewal cycle a repower owner runs about every twenty years.

RENEW — MORE CAPACITYSame site · same interconnection · renewed every ~20 yearsGen 1aging outRepoweredtaller · more MW

The repower decision on the dashboard

Repower starts before the first crane: which assets are aging out, and what it costs to renew them.

The fleet — what's aging out?

Asset Aging Portfolio

POD
011233445Q1Q2Q3Q4
0-9 yrs: 22
10-17 yrs: 14
18+ yrs: 9
Total Assets0
Avg Age0.0yr
Replace Budget$99.0M
0-9 yrs is the largest cohort (22 assets) — condition remains strong
The decision — repower or run on?

Equipment Replacement Planner

POD
0yr6yr13yr19yr25yrREPLACEVintage 1.5 ..Gen-2 2.0 MW..Fixed-tilt P..
Avg Age0.0yr
Fleet Value$99.0M
Near Replace1
Replace Cost$42.0M
1 asset past 80% lifecycle — $42.0M replacement budget needed

Built for the repower, not a greenfield form

What gets trackedGreenfield templatePOD repower platform
Progress %Plus turbines removed + re-erected + energized
EquipmentCranes for teardown AND rebuild — worked vs waiting
Weather noteLift window for both the removal and the pick
Removals & salvageComponents down, recycled, and diverted from landfill
Reused foundation / interconnectionReported against the existing base, not a new site
Capacity uplift (MW before → after)The number the whole repower is justified by

Free renewable templates & KPI tools

Browse POD's free construction daily-report templates, or use the free KPI calculators — Google Sheets, Excel, or PDF. No account needed. A dedicated wind repowering template is on the way.

Keep them one click away — press Ctrl/⌘ + D to bookmark POD's free tools.

Renewable repowering questions

A repower day is two projects at once — a demolition and a build on the same reused foundation and interconnection. A greenfield template captures the erection but not the removals, the salvage and recycling, or the capacity uplift. POD reports both halves the day they happen: what came down, what went up, and the MW gained.

Report the repower, both halves

Start with onshore wind repowering — every removal, every reused foundation, every re-erected turbine, spoken from the field and on the record.